[1] 徐成光. “16字地下洞群开挖法”在向家坝电站地下厂房洞群开挖施工中的应用[J]. 四川水力发电,2009,28(4):7–10.(XU Chengguang. Application of“16 words underground caverns excavation method” in excavation construction of underground powerhouse caverns at xiangjiaba hydropower station[J]. Sichuan Water Power,2009,28(4):7–10.(in Chinese))
[2] 刘世煌. 我国高地应力地区地下厂房围岩稳定分析及其中几个问题[J]. 西北水电技术,1988,(2):21–29.(LIU Shihuang. Stability analysis and a few problems of underground chambers and caverns in the areas with high in-situ stress[J]. Northwest Hydropower,1988,(2):21–29.( in Chinese))
[3] 李伟泉. 糯扎渡水电站地下引水发电系统开挖施工综述[J]. 云南水力发电,2010,26(4):49–53.(LI Weiquan. Summary of excavation and construction of the power tunnel system of Nuozhadu hydropower project[J]. Yunnan Water Power,2010,26(4):49–53.(in Chinese))
[4] 尹 强,杨建军. 向家坝电站地下厂房系统洞室开挖方法[J]. 四川水力发电,2009,28(4):1–7.(YIN Qiang,YANG Jianjun. Cavern excavation method for underground powerhouse complex at Xiangjiaba hydropower station[J]. Sichuan Water Power,2009,28(4):1–7.(in Chinese))
[5] 任少铭,曾志全. 小湾水电站地下厂房开挖技术[J]. 水力发电,2008,34(8):43–46.(REN Shaoming,ZENG Zhiquan. Excavation technology of underground powerhouse of Xiaowan hydropower station[J]. Water Power,2008,34(8):43–46.(in Chinese))
[6] 祁向明. 龙滩水电站地下厂房快速开挖施工技术综述[J]. 水利水电施工,2008,(4):34–39.(Qi Xiangming,An overview of fast construction technique of Longtan hydropower station underground powerhouse[J]. Water Conservancy and Hydropower Project,2008,(4):34–39.(in Chinese))
[7] 段征宇. 三板溪地下厂房施工阶段围岩稳定控制[J]. 云南水力发电,2005,21(1):45–49.(DUAN Zhengyu. Stability control of surrounding rocks during construction of the Sanbanxi underground powerhouse[J]. Yunnan Water Power,2005,21(1):45–49.(in Chinese))
[8] 柯习正,李军耀,李兴易. 瀑布沟水电站地下厂房开挖阶段赶工措施[J]. 四川水力发电,2007,26(4):8–10.(KE Xizheng,LI Junyao,LI Xingyi. Faster progress during excavation of underground powerhouse at Pubugou hydropower station[J]. Sichuan Water Power,2007,26(4):8–10.(in Chinese))
[9] 李术才,朱维申,张玉军. 裂隙岩体大型洞室群施工顺序优化研究[J]. 岩土工程学报,1998,20(1):1–4.(LI Shucai,ZHU Weishen,ZHANG Yujun. Research on construction sequence majorization for a group of caverns in joined rock mass[J]. Chinese Journal of Geotechnical Engineering,1998,20(1):1–4.(in Chinese))
[10] 邓昌铁,魏庭光. 天荒坪抽水蓄能电站地下厂房洞室群合理开挖顺序研究[J]. 河海大学学报,1999,27(5):68–72.(DENG Changtie,WEI Tingguang. Study on reasonable excavation procedure of underground cavities of Tianhuangping pumped storage power station[J]. Journal of Hohai University,1999,27(5):68–72.(in Chinese))
[11] 杨明举,常艄东. 超大型地下洞室群施工开挖程序及围岩稳定分析[J]. 西南交通大学学报,2000,35(1):32–35.(YANG Mingju,CHANG Shaodong. The excavation procedure of super-large underground chambers and the surrounding rock stability[J]. Journal of Southwest Jiaotong University,2000,35(1):32–35.(in Chinese))
[12] 朱维申,李术才,程 峰. 能量耗散模型在大型地下洞室群施工优化分析中的应用[J]. 岩土工程学报,2001,23(3):333–336.(ZHU Weishen,LI Shucai,CHENG Feng. Application of energy dissipation model to optimization of construction order for large underground caverns[J]. Chinese Journal of Geotechnical Engineering,2001,23(3):333–336.(in Chinese))
[13] 陈卫忠,朱维申,李术才,等. 水布垭大型地下厂房施工顺序和锚固参数优化分析研究[J]. 岩石力学与工程学报,2003,22(10):1 623–1 628.(CHEN Weizhong,ZHU Weishen,LI Shucai,et al. Optimization of the construction sequence and horing parameters in the large underground cavern excavation of Shuibuya project[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(10):1 623–1 628.(in Chinese))
[14] 陈卫忠,李术才,朱维申,等. 急倾斜层状岩体中巨型地下洞室群开挖施工理论与优化研究[J]. 岩石力学与工程学报,2004,23(19):3 281–3 287.(CHEN Weizhong,LI Shucai,ZHU Weishen,et al. Excavation and optimization theory for giant underground caverns constructed in high dipping laminar strata[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(19):3 281–3 287.(in Chinese))
[15] 高焕焕,文端超,李 宁. 高地应力下大型地下厂房开挖方案优化分析[J]. 四川大学学报:工程科学版,2007,39(增):52–56.(GAO Huanhuan,WEN Duanchao,LI Ning. Excavation sequence and analysis on huge underground powerhouse in high in-situ stress[J]. Journal of Sichuan University:Engineering Science,2007,39(Supp.):52–56.(in Chinese))
[16] 杨海霞,刘志鹏,卓家寿. 地下洞室群开挖顺序优化设计[J]. 河海大学学报:自然科学版,2008,36(6):786–789.(YANG Haixia,LIU Zhipeng,ZHUO Jiashou. Optimum design of excavation sequence underground cavity groups[J]. Journal of Hohai University:Natural Science,2008,36(6):786–789.(in Chinese))