[1] |
徐成光. “16字地下洞群开挖法”在向家坝电站地下厂房洞群开挖施工中的应用[J]. 四川水力发电,2009,28(4):7-10.(XU Chengguang.Application of“16 words underground caverns excavation method”in excavation construction of underground powerhouse caverns at xiangjiaba hydropower station[J].Sichuan Water Power,2009,28(4):7-10.(in Chinese))
|
[2] |
刘世煌. 我国高地应力地区地下厂房围岩稳定分析及其中几个问题[J]. 西北水电技术,1988,(2):21-29.(LIU Shihuang. Stability analysis and a few problems of underground chambers and caverns in the areas with high in-situ stress[J]. Northwest Hydropower,1988,(2):21-29.( in Chinese))
|
[3] |
李伟泉. 糯扎渡水电站地下引水发电系统开挖施工综述[J]. 云南水力发电,2010,26(4):49-53.(LI Weiquan.Summary of excavation and construction of the power tunnel system of Nuozhadu hydropower project[J]. Yunnan Water Power,2010,26(4):49-53.(in Chinese))
|
[4] |
尹强,杨建军. 向家坝电站地下厂房系统洞室开挖方法[J]. 四川水力发电,2009,28(4):1-7.(YIN Qiang,YANG Jianjun.Cavern excavationmethod for underground powerhouse complex atXiangjiabahydropower station[J]. Sichuan Water Power,2009,28(4):1-7.(in Chinese))
|
[5] |
任少铭,曾志全. 小湾水电站地下厂房开挖技术[J]. 水力发电,2008,34(8):43-46.(RENShaoming,ZENG Zhiquan.Excavation technology of underground powerhouse of Xiaowan hydropower station[J].Water Power,2008,34(8):43-46.(in Chinese))
|
[6] |
祁向明.龙滩水电站地下厂房快速开挖施工技术综述[J]. 水利水电施工,2008,(4):34-39.(Qi Xiangming,An overview of fast construction technique of Longtan hydropower station underground powerhouse[J]. Water Conservancy and Hydropower Project,2008,(4):34-39.(in Chinese))
|
[7] |
段征宇. 三板溪地下厂房施工阶段围岩稳定控制[J]. 云南水力发电,2005,21(1):45-49.(DUAN Zhengyu. Stability control of surrounding rocks during construction of the Sanbanxi underground powerhouse[J]. Yunnan Water Power,2005,21(1):45-49.(in Chinese))
|
[8] |
柯习正,李军耀,李兴易.瀑布沟水电站地下厂房开挖阶段赶工措施[J].四川水力发电,2007,26(4):8-10.(KE Xizheng,LI Junyao,LI Xingyi. Faster progress during excavation of underground powerhouse at Pubugou hydropower station[J]. Sichuan Water Power,2007,26(4):8-10.(in Chinese))
|
[9] |
李术才,朱维申,张玉军. 裂隙岩体大型洞室群施工顺序优化研究[J]. 岩土工程学报,1998,20(1):1-4.(LI Shucai,ZHU Weishen,ZHANG Yujun. Research on construction sequence majorization for a group of caverns in joined rockmass[J].Chinese Journal of Geotechnical Engineering,1998,20(1):1-4.(in Chinese))
|
[10] |
邓昌铁,魏庭光. 天荒坪抽水蓄能电站地下厂房洞室群合理开挖顺序研究[J]. 河海大学学报,1999,27(5):68-72.(DENG Changtie,WEI Tingguang. Study on reasonable excavation procedure of underground cavities of Tianhuangping pumped storage power station[J].Journal of Hohai University,1999,27(5):68-72.(in Chinese))
|
[11] |
杨明举,常艄东. 超大型地下洞室群施工开挖程序及围岩稳定分析[J]. 西南交通大学学报,2000,35(1):32-35.(YANGMingju,CHANG Shaodong. The excavation procedure of super-large underground chambers and the surrounding rock stability[J].Journal of Southwest Jiaotong University,2000,35(1):32-35.(in Chinese))
|
[12] |
朱维申,李术才,程峰. 能量耗散模型在大型地下洞室群施工优化分析中的应用[J]. 岩土工程学报,2001,23(3):333-336.(ZHU Weishen,LI Shucai,CHENG Feng. Application of energy dissipation model to optimization of construction order for large underground caverns[J]. Chinese Journal of Geotechnical Engineering,2001,23(3):333-336.(in Chinese))
|
[13] |
陈卫忠,朱维申,李术才,等. 水布垭大型地下厂房施工顺序和锚固参数优化分析研究[J].岩石力学与工程学报,2003,22(10):1623-1628.(CHEN Weizhong,ZHU Weishen,LI Shucai,et al. Optimization of the construction sequence and horing parameters in the large underground cavern excavation of Shuibuya project[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(10):1623-1628.(in Chinese))
|
[14] |
陈卫忠,李术才,朱维申,等. 急倾斜层状岩体中巨型地下洞室群开挖施工理论与优化研究[J]. 岩石力学与工程学报,2004,23(19):3281-3287.(CHEN Weizhong,LI Shucai,ZHU Weishen,etal.Excavation and optimization theory for giant underground caverns constructed in high dipping laminar strata[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(19):3281-3287.(in Chinese))
|
[15] |
高焕焕,文端超,李宁. 高地应力下大型地下厂房开挖方案优化分析[J].四川大学学报:工程科学版,2007,39(增):52-56.(GAO Huanhuan,WEN Duanchao,LI Ning. Excavation sequence and analysis on huge underground powerhouse in high in-situ stress[J]. Journal of Sichuan University:Engineering Science,2007,39(Supp.):52-56.(in Chinese))
|
[16] |
杨海霞,刘志鹏,卓家寿. 地下洞室群开挖顺序优化设计[J]. 河海大学学报:自然科学版,2008,36(6):786-789.(YANG Haixia,LIU Zhipeng,ZHUO Jiashou. Optimum design of excavation sequence underground cavity groups[J]. Journal of Hohai University:Natural Science,2008,36(6):786-789.(in Chinese))
|