[1] |
国家发展和改革委员会. 核电中长期发展规划(2005~2020年)[M].北京,2007:7-9.(National Development and the Reform Committee. Long-term nuclear power development program(in 2005—2020)[M]. Beijing,2007:7-9.(in Chinese))
|
[2] |
中华人民共和国国家标准编写组. GB 50267—97 核电厂抗震设计规范[S]. 北京:中国计划出版社,1998.(The National StandardsCompilation Group of People′s Republic of China. GB 50267—97 Code for seismic design of nuclear power plants[S]. Beijing:Chinese Plan Press,1998.(in Chinese))
|
[3] |
田胜清,翟贵华.核动力工程厂址选择专家系统[J].核工程研究与设计,1996,(18):3-8.(TIAN Shengqing,ZHAI Guihua.Introduction ofnuclear power engineering site selection expert system[J]. Nuclear Engineering Research and Design,1996,(18):3-8.(in Chinese))
|
[4] |
电力工业部规划计划司. 核电厂工程地质勘测规定(试行1996)[S]. 北京:中国电力出版社,1996.(Planning and Planning Departmentof Ministry of PowerIndustry. Regulation for geology engineering surveyingof Nuclear Power Plant(try out,1996)[S]. Beijing:China Electric Power Press,1996.(in Chinese)).
|
[5] |
中华人民共和国行业标准编写组. DL/T 5353—2006水电水利工程边坡设计规范[S]. 北京:中国电力出版社,2007.(The Professional StandardsCompilation Group of People′s Republic of China. DL/T 5353—2006 Design specification for slope of hydropower and water conservancy project[S]. Beijing:China Electric Power Press,2007.(in Chinese)).
|
[6] |
陈祖煜.土质边坡稳定分析——原理、方法、程序[M].北京:中国水利水电出版社,2003:463-531.(CHEN Zhuyu. Analysis of soil slope stability—theory,methods and programs[M]. Beijing:China WaterPower Press,2003:463-531.(in Chinese))
|
[7] |
陈祖煜,汪小刚,杨健,等. 岩质边坡稳定分析——原理、方法、程序[M]. 北京:中国水利水电出版社,2003:446-614.(CHEN Zhuyu,WANG Xiaogang,YANG Jian,et al. Rock slope stability analysis—theory,methods and programs[M]. Beijing:China WaterPower Press,2003:446-614.(in Chinese))
|
[8] |
李敏.岭澳核电工程38m平台边坡处理[J].工业建筑,2005,(增1):613-614.(LI Min. Application of slope treatment technology in LingAo nuclear power station[J]. Industrial Construction,2005,(Supp.1):613-614.(in Chinese))
|
[9] |
陈建峰,孙立川,石振明,等. 浙江三门核电厂人工高边坡稳定性评价[J]. 岩土力学,2005,26(增2):15-21.(CHEN Jianfeng,SUN Lichuan,SHI Zhenming,et al.Stability evaluation of high rocky slope ofZhejiang Sanmen nuclear power plant[J]. Rock and Soil Mechanics,2005,26(Supp.2):15-21.(in Chinese))
|
[10] |
何宝石.预应力锚索在高边坡的应用[J].电力勘测,2002,36(4):17-19.(HE Baoshi. Application of prestressed anchor rope in high slope[J]. Electric Power Survey,2002,36(4):17-19.(in Chinese))
|
[11] |
高倚山,朱海骏,吴 建,等. 湖北核电厂岩质高边坡稳定性研究与工程设计方案[C]// 第3届全国水工岩石力学学术会议. 北京:中国水利出版社,2010:8.(GAO Qishan,ZHU Haijun,WU Jian,et al. Stability analysis and design of high rock slope at Hubei nuclear power plant[C]// Proceedings of the 3rd National Conference on Hydraulic Rock Mechanics. Beijing:China Water Power Press,2010:8.(in Chinese))
|
[12] |
庄 云,万 波,谷晓曦,等. 吉林核电站厂址边坡稳定性分析[J]. 辽宁师范大学学报:自然科学版,2001,24(2):196-198.(ZHUANGYun,WAN Bo,GU Xiaoxi,et al.Basalt site slope stability analysis of the Jilin nuclear power station[J].Journal of Liaoning Normal University:Natural Science,2001,24(2):196-198.(in Chinese))
|
[13] |
SU SR,LI TL,MAO YL,et al. The stability evaluation and design of the high slope at Lianyungang nuclear power station[J].Chinese Journal of Rock Mechanics and Engineering,2000,19(1):101-106.
|
[14] |
郑文棠,程小久. 核电厂边坡地震影响系数研究[J]. 华南地震,2010,30(增):36-43.(ZHENG Wentang,CHENG Xiaojiu. Studies on seismic influence coefficience of slopes near nuclear power plant[J]. South China Journal of Seismology,2010,30(Supp.):36-43.(in Chinese))
|
[15] |
郑文棠,程小久,李焯芬,等. 核电厂边坡地震动力响应研究[J]. 岩石力学与工程学报,2011,30(增2):3 514-3 521.(ZHENG Wentang,CHENG Xiaojiu,LEE CF,et al.Research on seismic response analysis of slopes in nuclear power plant[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(Supp.2):3 514-3 521.(in Chinese))
|
[16] |
古迅.核电工程地质(五)[J]. 工程地质学报,1996,4(3):91-96. (GU Xun. Engineering geology in the constructing of nuclear power plant(fifth)[J]. Journal of Engineering Geology,1996,4(3):91-96. (in Chinese))
|
[17] |
张润明,郑文棠. 《核电厂常规岛设计规范》边坡专题报告[R]. 广州:广东省电力设计研究院,2012.(ZHANG Runming,ZHENG Wentang. Special report for slope provisions on nuclear power plant conventional island design codes[R]. Guangzhou:Guangdong Electric Power Design Institute,2012.(in Chinese))
|
[18] |
周维垣,杨若琼,杨强,等. 岩石力学的解析与数值模拟[C]//王思敬主编.中国岩石力学与工程——世纪成就.南京:河海大学出版社,2004:357-386.(ZHOU Weiyuan,YANG Luoqiong,YANG Qiang,et al. Analytic methods and numerical simulation of rock mechanics[C]// WANG Sijinged.Century Achievements of Rock Mechanics and Engineering in China. Nanjing:Hohai University Press,2004:357-386.(in Chinese))
|
[19] |
CUNDALL P A. A computer model for simulating progressive large scale movements in blocky rock systems[C]// Proceedings of the Symposium of the International Society for Rock Mechanics.Nancy,France:[s. n.],1971:2-8.
|
[20] |
郑文棠,徐卫亚,童富果,等. 复杂边坡三维地质可视化和数值模型构建[J]. 岩石力学与工程学报,2007,26(8):1 633-1 644. (ZHENG Wentang,XU Weiya,TONG Fuguo,et al.Three-dimensional geological visualization and numerical modeling of complicate slope[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(8):
|
1 |
633-1 644.(in Chinese))
|
[21] |
黄润秋,刘卫华,周江平,等. 滚石运动特征试验研究[J]. 岩土工程学报,2007,29(9):1 296-1 302.(HUANG Runqiu,LIU Weihua,ZHOU Jiangping,et al. Rolling tests on movement characteristics of rock blocks[J].Chinese Journal of Geotechnical Engineering,2007,29(9):1 296-1 302.(in Chinese))
|