[1] 谭慧明,刘汉龙. 桩承加筋路堤中路堤与褥垫层共同作用理论分析[J]. 岩土力学,2008,29(8):2 271–2 276.(TAN Huiming,LIU Hanlong. Theoretical analysis of combined action of cushion and embankment fills in pile-supported embankment[J]. Rock and Soil Mechanics,2008,29(8):2 271–2 276.(in Chinese))
[2] 赵明华,张 玲,赵 衡. 双向增强复合地基沉降计算方法研究[J]. 岩土力学,2011,32(9):2 741–2 746.(ZHAO Minghua,ZHANG Ling,ZHAO Heng. Settlement calculation of two-directional reinforced composite foundation[J]. Rock and Soil Mechanics,2011,32(9):2 741–2 746.(In Chinese))
[3] 刘俊飞,赵国堂,马建林. 桩网复合地基桩顶土拱形态分析[J]. 铁道学报,2011,33(6):81–87.(LIU Junfei,ZHAO Guotang,MA Jianlin. Analysis of conformation of soil arch on the pile head of composite pile-net foundations[J]. Journal of the China Railway Society,2011,33(6):81–87.(in Chinese))
[4] 曾俊铖,张继文,童小东,等. 高速铁路CFG桩复合地基应力特性试验研究[J]. 铁道学报,2011,33(5):91–96.(ZENG Juncheng,ZHANG Jiwen,TONG Xiaodong,et al. In-situ test of stress characteristics of CFG pile composite foundation of high-speed railway[J]. Journal of the China Railway Society,2011,33(5):91–96.(in Chinese))
[5] 张 良,罗 强,陈亚美,等. 桩网结构路基承载特性的现场试验研究[J]. 岩土力学,2010,31(12):3 793–3 800.(ZHANG Liang,LUO Qiang,CHEN Yamei,et al. Research on bearing behavior of pile-net structure subgrade based on field test[J]. Rock and Soil Mechanics,2010,31(12):3 793–3 800.(in Chinese))
[6] 沈 伟,池跃君,宋二祥. 考虑桩、土、垫层协同作用的刚性桩复合地基沉降计算方法[J]. 工程力学,2003,20(2):36–42.(SHEN Wei,CHI Yuejun,SONG Erxiang. Settlement calculation of composite ground with rigid piles including pile-soil-cushion interaction[J]. Engineering Mechanics,2003,20(2):36–42.(in Chinese))
[7] 王炳龙,周顺华,杨龙才. 高速铁路软土路基工后沉降试验研究[J]. 同济大学学报,2003,31(10):1 163–1 167.(WANG Binglong,ZHOU Shunhua,YANG Longcai. Experimental study on soft soil settlement of high-speed railway subgrade after construction[J]. Journal of Tongji University,2003,31(10):1 163–1 167.(in Chinese))
[8] 王炳龙,杨龙才,周顺华,等. CFG桩控制深厚层软土地基沉降的试验研究[J]. 铁道学报,2006,28(6):112–116.(WANG Binglong,YANG Longcai,ZHOU Shunhua,et al. Experimental study on the settlement control of high-speed railway subgrade over deep soft clay reinforced by CFG piles[J]. Journal of the China Railway Society,2006,28(6):112–116.(in Chinese))
[9] 池跃君,宋二祥,陈肇元. 刚性桩复合地基沉降计算方法的探讨及应用[J]. 土木工程学报,2003,36(11):19–23.(CHI Yuejun,SONG Erxiang,CHEN Zhaoyuan. An simplified method for settlement of rigid-pile composite foundation and its application[J]. China Civil Engineering Journal,2003,36(11):19–23.(in Chinese))
[10] 闫宝杰,宋修广,岳跃群. 粉喷桩复合地基附加应力的Boussinesq- Mindlin联合解法[J]. 岩土力学,2007,28(6):1 255–1 258.(YAN Baojie,SONG Xiuguang,YUE Yuequn. Boussinesq-Mindlin united solution method for DJMP composite foundation additional stress[J]. Rock and Soil Mechanics,2007,28(6):1 255–1 258.(in Chinese))
[11] 张忠苗,陈 洪,吴慧明. 柔性承台下复合地基应力和沉降计算研究[J]. 岩土力学,2004,25(3):451–454.(ZHANG Zhongmiao,CHEN Hong,WU Huiming. Research on stress and settlement of composite ground with soft base slab[J]. Rock and Soil Mechanics,2004,25(3):451–454.(in Chinese))
[12] Deutsche Gesellschaft für Geotechnik e. V. Entwurf der Empfehlung:Bewehrte Erdkörper auf punkt-order linienförmigen Traggliendern[S]. Berlin:Ernst and Sohn,2004.
[13] 罗 强,张敏静,张 良,等. 路堤荷载作用下高强度桩复合地基土中的应力[J]. 西南交通大学学报,2010,45(5):780–786.(LUO Qiang,ZHANG Minjing,ZHANG Liang,et al. Additional stress in high-strength pile composite foundation under embankment load[J]. Journal of Southwest Jiaotong University,2010,45(5):780–786.(in Chinese))
[14] 沈珠江. 理论土力学[M]. 北京:中国水利水电出版社,2000:89–95.(SHEN Zhujiang. Theoretical soil mechanics[M]. Beijing:China Water Power Press,2000:89–95.(in Chinese))
[15] 中国铁道科学研究院. 高速铁路CFG桩复合地基室内模拟试验研究[R]. 北京:中国铁道科学研究院,2008.(China Academy of Railway Sciences. Experimental study of CFG pile composite foundation of high-speed railway[R]. Beijing:China Academy of Railway Sciences,2008.(in Chinese))
[16] 胡一峰,李怒放. 高速铁路无砟轨道路基设计原理[M]. 北京:中国铁道出版社,2010:181–191.(HU Yifeng,LI Nufang. Theory of ballastless track-subgrade for high-speed railway[M]. Beijing:China Railway Publishing House,2010:181–191.(in Chinese))