[1] |
张 川,杨春满,左永江. 松软地层水平管棚工艺参数的研究[J]. 煤炭学报,2000,25(6):607-609.(ZHANG Chuan,YANG Chunman,ZUO Yongjiang. Study on the art parameters of horizontal barrel vault advanced support in the soft rock[J].Journal of China Coal Society,2000,25(6):607-609.(in Chinese))
|
[2] |
叶超明,郑智军,陈小满. 拾荷隧道下穿铁路段设计与施工技术要点[J]. 重庆交通学院学报,2001,20(2):106-109.(YE Chaoming,ZHENG Zhijun,CHEN Xiaoman. Main points of the design and construction technique of the Shihe tunnel beneath the railway[J].Journal of Chongqing Jiaotong University,2001,20(2):106-109.(in Chinese))
|
[3] |
杨 钊,戴 宇,余 俊. 厦门翔安隧道进口段管棚支护参数优化分析[J]. 铁道工程学报,2009,(7):76-79.(YANG Zhao,DAI Yu,YU Jun. Analysis of optimizing parameters for pipe roof construction to the portal section ofXiang¢an submarine tunnel in Xiamen[J]. Journal of Railway Engineering Society,2009,(7):76-79.(in Chinese))
|
[4] |
英 旭. 浅覆地层过街通道小管棚法施工技术[J]. 施工技术,2005,34(6):24-26.(YING Xu. Little pipe shed method construction technology adopted in a shallow cover underpass[J]. Construction Technology,2005,34(6):24-26.(in Chinese))
|
[5] |
周顺华. 软弱地层浅埋暗挖隧道施工中管棚法的棚架原理[J]. 岩石力学与工程学报,2005,24(14):2 565-2 570.(ZHOU Shunhua. Principlesof pipe roof applied to shallow-buried tunnels in soft ground[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(14):2 565-2 570.(in Chinese))
|
[6] |
董新平,周顺华,胡新朋. 软弱地层开挖荷载引起管棚内力敏感度分析[J]. 同济大学学报:自然科学版,2006,34(8):1 016-1 020. (DONG Xinping,ZHOU Shunhua,HU Xinpeng. Designsensitivity analysis of pipe roof inner force induced by excavation release load in soft ground[J]. Journal of Tongji University:Natural Science,2006,34(8):1 016-1 020.(in Chinese))
|
[7] |
董新平,周顺华,胡新朋. 软弱地层管棚法施工中管棚作用空间分析[J]. 岩土工程学报,2006,28(7):841-846.(DONG Xinping,ZHOU Shunhua,HU Xinpeng. 3D analysis of function of pipe roof applied in soft ground[J]. Chinese Journal of Geotechnical Engineering,2006,28(7):841-846.(in Chinese))
|
[8] |
苟德明,阳军生,张 戈. 浅埋暗挖隧道管棚变形监测及受力机制分析[J]. 岩石力学与工程学报,2007,26(6):1 258-1 264.(GOU Deming,YANG Junsheng,ZHANG Ge. Deformation monitoring and mechanical behaviors of pipe-roof in shallow tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(6):1 258- 1 264.(in Chinese))
|
[9] |
TERZAGHI K. Theoretical soil mechanics[M]. New York:John Wiley and Sons,1943:37-42.
|
[10] |
杨雪强,何世秀,庄心善. 土木工程中的成拱效应[J]. 湖北工学院学报,1994,9(1):1-7.(YANG Xueqiang,HE Shixiu,ZHUANG Xinshan. On arch effect in civil engineering[J]. Journal of HubeiInstitute of Technology,1994,9(1):1-7.(in Chinese))
|
[11] |
将良潍,黄润秋,蒋忠信. 黏性土桩间土拱效应计算与桩间距分析[J]. 岩土力学,2006,27(3):445-450.(JIANG Liangwei,HUANG Runqiu,JIANG Zhongxin. Analysis of soil arching effect between adjacent piles and their spacing in cohesive soils[J]. Rock and Soil Mechanics,2006,27(3):445-450.(in Chinese))
|
[12] |
向先超,张 华,蒋国盛,等. 基于颗粒流的抗滑桩土拱效应研究[J]. 岩土工程学报,2011,33(3):386-391.(XIANG Xianchao,ZHANG Hua,JIANG Guosheng,et al. Soil arching effect of anti-slide piles based on particle flow method[J]. Chinese Journal of Geotechnical Engineering,2011,33(3):386-391.(in Chinese))
|
[13] |
曹卫平,陈云敏,陈仁朋. 考虑路堤填筑过程与地基土固结相耦合的桩承式路堤土工效应分析[J]. 岩石力学与工程学报,2008,27(8):1 610-1 617.(CAO Weiping,CHEN Yunmin,CHEN Renpeng. Analysis of soil arching in piled embankments considering coupled effect of embankment filling and soil consolidation[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(8):1 610-1 617.(in Chinese))
|
[14] |
张 蓓,王建鹏,王复明,等. 隧道超前小导管对掌子面稳定性影响分析[J]. 郑州大学学报:工学版,2009,30(4):30-34.(ZHANG Bei,WANG Jianpeng,WANG Fuming,et al. Analysis oftunnel leading conduit affecting the stability of tunnel face[J]. Journal of Zhengzhou University:Engineering Science,2009,30(4):30-34.(in Chinese))
|
[15] |
British Standard Institute. British standard 8006 strengthened/ reinforced soils and other fills[S]. London:British Standard Institute,1995:85-88.
|
[16] |
中华人民共和国国家标准编写组. GB50330—2002建筑边坡工程技术规范[S]. 北京:中国建筑工业出版社,2002.(The National Standards Compilation Group of People¢s Republic of China. GB50330—2002 Technical code for building slope engineering[S]. Beijing:China Architecture and Building Press,2002.(in Chinese))
|