| TRIAL METHOD FOR SIMULATING TUNNEL DISCHARGE |
| Wang Jianxiu1, Yang Lizhong2, He Jing1 |
| (1Department of Geotechnical Engineering,Tongji University, Shanghai 200092 China) (2Southwest Jiaotong University, Chengdu 610031 China) |
|
|
|
|
Abstract During the construction of a tunnel,if no measure is adopted to prevent groundwater discharge,the movement of groundwater along tunnel axis can be ignored and the seepage movement of groundwater can be simplified to 2D movement in section after completion of the tunnel. If the size of a deep tunnel is far less than that of its surrounding aquifer,it can be treated as a point-well in section. Trial calculation is performed by putting a value of discharge,estimated by analogy,into the numerical model and by repeated increases or decrease in a certain step until the groundwater table reaches the stable state. Then a trial discharge can be obtained. The discharge of a deep tunnel in southwest China calculated by the trial method accords well with results of other methods and its significance of hydro-geology is more clear,when used together with experimental and analytical methods. The value of discharge can be calculated more precisely,and this indicates that it can be used practically.
|
|
|
|
|
|
|
1 雅贝尔. 地下水水力学[M]. 北京:地质出版社,1985
2 仵颜卿,张倬元. 岩体水力学导论[M]. 成都:西南交通大学出版 社,1995
3 李俊亭. 地下水流数值模拟[M]. 北京:地质出版社,1989
4 陈崇希,唐仲华. 地下水流动问题数值方法[M]. 武汉:中国地质大学出版社,1990
|
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|