|
[1] 李晓红. 隧道新奥法及其量测技术[M]. 北京:科学出版社,2002. (LI Xiaohong. New austrian tunneling method and its monitoring technology[M]. Beijing:Science Press,2002.(in Chinese))
[2] 中华人民共和国行业标准编写组. JTG D70–2004公路隧道设计规范[S]. 北京:人民交通出版社,2004.(The Professional Standards Compilation Group of People′s Republic of China. JTG D70–2004 Specifications for design of highway tunnel[S]. Beijing:China Communications Press,2004.(in Chinese))
[3] 夏才初,龚建伍,唐 颖,等. 大断面小净距公路隧道现场监测分析研究[J]. 岩石力学与工程学报,2007,26(1):44–50.(XIA Caichu,GONG Jianwu,TANG Ying. Study of site monitoring of large-section highway tunnels with small clear spacing[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(1):44–50.(in Chinese))
[4] 刘艳青,钟世航,卢汝绥,等. 小净距并行隧道力学状态的试验研究[J]. 岩石力学与工程学报,2000,19(5):590–594.(LIU Yanqing,ZHONG Shihang,LU Rusui,et al. Experimental study of mechanical characteristics of twin tunnels with small spacing[J]. Chinese Journal of Rock Mechanics and Engineering,2000,19(5):590–594.(in Chinese))
[5] 蔡小林,吴从师,SWOBODA G. 小间距浅埋隧道的支护设计探讨[J]. 岩石力学与工程学报,2005,24(增2):5 943–5 949.(CAI Xiaolin,WU Congshi,SWOBODA G. Discussion on support system between two parallel closely-spaced shallow-buried tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(Supp.2):5 943–5 949.(in Chinese))
[6] 龚建伍,夏才初,朱合华,等. 鹤上大断面小净距隧道施工方案优化分析[J]. 岩土力学,2009,30(1):236–240.(GONG Jianwu,XIA Caichu,ZHU Hehua,et al. Optimal analysis of construction schemes for Heshang small-space tunnels with large section[J]. Rock and Soil Mechanics,2009,30(1):236–240.(in Chinese))
[7] 龚建伍. 扁平大断面小净距公路隧道施工力学研究[博士学位论文][D]. 上海:同济大学,2008.(GONG Jianwu. Study of construction mechanical behavior of highway tunnel with large section and small spacing[Ph. D. Thesis][D]. Shanghai:Tongji University,2008.(in Chinese))
[8] 缪圆冰. 魁岐2#隧道工程地质评价[R].福建:福建省交通规划设计院,2007.(MIAO Yuanbing. Engineering geology evaluation of Kuiqi tunnel #2[R]. Fuzhou:Fujian Communications Planning and Design Institute,2007.(in Chinese))
[9] 缪圆冰. 福州长乐国际机场高速公路二期工程(A3标段)两阶段施工设计[R]. 福建:福建省交通规划设计院,2007.(MIAO Yuanbing. Two stage construction design of the second phase project(Tender A3) of Changle international airport highway in Fuzhou[R]. Fuzhou:Fujian Provincial Communications Planning and Design Institute,2007.(in Chinese))
[10] 刘金杰. 大断面连拱隧道监控量测及施工力学研究[硕士学位论文][D]. 重庆:重庆交通大学,2008.(LIU Jinjie. Construction mechanics and monitoring measurement of large-span multi-arch tunnel[M. S. Thesis][D]. Chongqing:Chongqi Jiaotong University,2008.(in Chinese))
[11] 崔茂玉. 公路隧道三维动态信息监控与施工力学分析研究[博士学位论文][D]. 上海:同济大学,2000.(CUI Maoyu. Three-dimensional information monitoring and construction mechanical analysis of road tunnel[Ph. D. Thesis][D]. Shanghai:Tongji University,2000.(in Chinese))
[12] 中华人民共和国行业标准编写组. JTG F60–2009公路隧道施工技术规范[S]. 北京:人民交通出版社,2009.(The Professional Standards Compilation Group of People¢s Republic of China. JTG F60–2009 Technical specification for construction of highway tunnel[S]. Beijing:China Communications Press,2009.(in Chinese))
[13]
|