(1. Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2. China Railway Siyuan Survey and Design Group Co.,Ltd.,Wuhan,Hubei 430063,China;3. Shanghai Investment Consulting Corporation,Shanghai 200003,China;4. Shanghai Institute of Architectural Design and Research Co.,Ltd.,Shanghai 200041,China;5. China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu,Sichuan 610031,China)
Abstract:Based on Longtoushan tunnel which is the largest in China at present in Guangzhou,the contents,technique and method of deformation monitoring of super large section tunnel are descried. The deformation law of the slope,surrounding rock and support system with different surrounding rocks are analyzed;and the engineering measures to control the deformation are put forward. The result shows that:(1) the construction of the up-stage in the right hole,the down-stage in the left hole and the up-stage of the core soil,which cause large rock deformation,are the main points for controlling the rock deformation;(2) the deformation has a exponential relationship with the radius of tunnel;and (3) the enclose of lining and using of cross anchor is effective method to improve the performance of lining and to restrain the deformation of the tunnel;and it is important to construct the inverted arch and close the lining. The study results can be for reference in the design,construction and research of similar tunnels.
周丁恒,曹力桥,曲海锋,易礼,房师涛. 不同围岩情况下特大断面公路隧道施工变形监测与控制[J]. 岩石力学与工程学报, 2009, 28(12): 2510-2519.
ZHOU Dingheng1,CAO Liqiao2,QU Haifeng3,YI Li4,FANG Shitao5. DEFORMATION MONITORING AND CONTROL OF SUPER LARGE SECTION HIGHWAY TUNNEL WITH DIFFERENT SURROUNDING ROCKS . , 2009, 28(12): 2510-2519.