Abstract:The characteristics of the linear location and the Geiger¢s location method are analyzed;and a new location method by combining the two location methods is given. With the multi-channel digital microseismic monitoring system in Shizhuyuan mine,the blasting with three location methods is proposed;and the results by making a blasting test at the assigned location are compared. Some conclusions are drawn as follows:the combination of the linear location and the Geiger¢s location method can solve the problem of low accuracy for the linear location;and the choice of initial value for the conventional Geiger¢s location method can be optimized. In addition,the efficiency of the iterative solution can be improved;and the singular result with an inaccurate initial location value when singular matrix happens in the locating process with the Geiger¢s method can be achieved.