Abstract:PHP (partially hydrolyzed polyacrylamide) slurry is especially suitable for the drilling of overlength and extra-large-diameter bored piles. Its economical efficiency and construction efficiency are dependent on the following key factors:manufacturing of raw materials,manufacturing process,cycling system and construction control. According to geological and hydrologic conditions of the site of Su-Tong Bridge,the testing pile project has adopted PHP slurry cycling system,which has been proved in the practice to have achieved thickness of mud cake around piles less than 1 mm and thickness of sediments at pile tip of zero.