CONSTRUCTION LICENSE MECHANISM AND ITS APPLICATION BASED ON KARST WATER INRUSH RISK EVALUATION
LI Liping1,LI Shucai1,CHEN Jun2,LI Jinglong1,XU Zhenhao1,SHI Shaoshuai1
(1. Geotechnical and Structural Engineering Research Center,Shandong University,Jinan,Shandong 250061,China;
2. Sanxia—Fanba Expressway Construction Headquarters of Hubei Province,Yichang,Hubei 443007,China)
Abstract:Water inrush and mud gushing are the typical common geologic hazards for the karst tunnel construction. Based on risk evaluation model of water inrush,management system of construction permission mechanism can be established to reduce the economic loss and water inrush risk. The major factors are summed up and selected as the impact factor of fuzzy analytic hierarchy process(FAHP) by collecting and collating information of water inrush examples of karst tunnels in recent 50 years,the membership function is proposed between the factors and the probability of occurrence of water inrush and its volume,and a FAHP model of risk evaluation for water inrush is established by a comprehensive assigning method which is adopted to determine the weight of evaluation indices;and water inrush risk can be evaluated for the three different stages of tunnel construction. Firstly,based on the preliminary evaluation for environment of dangerous source at the prospecting stage,the risk factors effect and construction of risk reduction can be determinated. Secondly,pre-evaluation of water inrush for environment of dangerous and risk factors can be done in order to prove the effectiveness of construction organization at the design stage. At last,based on distribution of the pre-evaluation results,risk grade can be modified by tracing the hydrogeology,mechanical and geophysical information of exposed rock during the excavation process;and risk control criterion and countermeasures for different excavated sections can be determined by identifying the environment of dangerous source and risk factors for next excavated section;and management system of construction risk can be established in order to get the accurate,effective and real-time risk control of water inrush. The risk management system of water inrush has been proved that the evaluation result is accurate and reliable by its application to three typical karst tunnel of Sanxia highway,which can be further used for other underground projects.
李利平1,李术才1,陈 军2,李景龙1,许振浩1,石少帅1. 基于岩溶突涌水风险评价的隧道施工许可机制及其应用研究[J]. 岩石力学与工程学报, 2011, 30(7): 1345-1355.
LI Liping1,LI Shucai1,CHEN Jun2,LI Jinglong1,XU Zhenhao1,SHI Shaoshuai1. CONSTRUCTION LICENSE MECHANISM AND ITS APPLICATION BASED ON KARST WATER INRUSH RISK EVALUATION. , 2011, 30(7): 1345-1355.
杨天鸿,唐春安,谭志宏,等. 岩体破坏突水模型研究现状及突水预测预报研究发展趋势[J]. 岩石力学与工程学报,2007,26(2):268-277.(YANG Tianhong,TANG Chun?an,TAN Zhihong,et al. State of the art of inrush models in rock mass failure and development trend for prediction and forecast of groundwater inrush[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(2):268-277.(in Chinese))
[7]
李利平,李术才,张庆松. 岩溶地区隧道裂隙水突出力学机制研究[J]. 岩土力学,2010,31(2):523-528.(LI Liping,LI Shucai,ZHANG Qingsong. Study of mechanism of water inrush induced by hydraulic fracturing in kast tunnels[J]. Rock and Soil Mechanics,2010,31(2):523-528.(in Chinese))
[8]
王 媛,王 飞,倪小东. 基于非稳定渗流随机有限元的隧洞涌水量预测[J]. 岩石力学与工程学报,2009,28(10):1 986-1 994. (WANG Yuan,WANG Fei,NI Xiaodong. Prediction of water inflow in tunnel based on stochastic finite element of unsteady seepage[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(10):1 986-1 994.(in Chinese))
[9]
黄宏伟. 隧道及地下工程建设中的风险管理研究进展[J]. 地下空间与工程学报,2006,2(1):13-20.(HUANG Hongwei. State of the art of the research on risk management in construction of tunnel and underground works[J]. Chinese Journal of Underground Space and Engineering,2006,2(1):13-20.(in Chinese))
Your browse does not support frame!