Abstract:Subsurface excavation tunnel at Punan section of phase I project of Xiamen airport road is a shallow-buried,large-span and soft rock tunnel,the surrounding construction environment is complex. Building #34 is a key protection object during tunnel traverses buildings. According to the structures,foundation rocks and surrounding environment of building #34,the ground tracking grouting method is adopted to protect buildings during construction by systematically analyzing the reliabilities and operabilities of various building protection schemes. The sleeve valve pipe grouting is adopted for building #34 according to grouting test results of buildings #104,#105. Monitoring points of building subsidence and crack development have been set in order to control the subsidence and crack development of building #34 and guide the construction timely. Monitoring results show that grouting uplift can control houses subsidence effectively. Finally,the total subsidence value of each monitoring point is controlled within 25 mm;the differential subsidence of each monitoring point is controlled within 1‰. The building #34 structures are in control state when tunnel traverses. Therefore,the grouting uplifting is a very important method to protect existing buildings traversed by tunnel. This study results will provide some references for similar tunnel projects.
彭正勇. 注浆抬升在隧道穿越既有建筑物中的研究及应用[J]. 岩石力学与工程学报, 2011, 30(S1): 2963-2969.
PENG Zhengyong. STUDY OF GROUTING UPLIFTING FOR EXISTING BUILDINGS TRAVERSED BY TUNNEL AND ITS APPLICATION. , 2011, 30(S1): 2963-2969.
李 浩,王 涛,徐日庆. 隧道施工对框架结构及地表位移影响的数值分析[J]. 铁道工程学报,2008,(9):58-61.(LI Hao,WANG Tao,XU Riqing. Numerical analysis of the influence of tunneling on ground movement and adjacent frame structure[J]. Journal of Railway Engineering Society,2008,(9):58-61.(in Chinese))
Your browse does not support frame!