Abstract:According to the construction of overlapping shield tunnel in soft soil area,four model tests have been carried out to simulate displacement and force variation rules of the existing tunnel due to the different construction orders and the different tunneling speeds. Experimental results indicate that:(1) In case of the upper tunnel first and the lower tunnel last,the lower tunnel construction leads to the longitudinal settlement of the upper tunnel. The circumferential internal force of tunnel segment of the upper tunnel generates deflection. The internal force in the arch bottom changes the most. (2) In case of the lower tunnel first and the upper tunnel last,the upper tunnel construction leads to the longitudinal uplift of the lower tunnel. The circumferential internal force of tunnel segment of the lower tunnel generates deflection. The internal force in the arch vault changes the most. (3) Regardless of the kind of construction orders,additional internal force along the longitudinal dimension will always be observed,with features of fluctuation and temporality. Comparing the influence of displacement and internal force on the existing tunnel induced by constructing overlapping tunnels,the lower tunnel first is better for the construction safety than the upper tunnel first. In the process of construction of overlapping shield tunnel,the additional deformation and force of the existing tunnel increase with the increase of tunnelling speed;and the impact range of tunnelling speed also increases. In this case,the tunnelling speed of the shield machine should be controlled in a proper range to avoid significant influence on the safety of adjacent existing tunnel structure.
谢雄耀1,2,牛俊涛1,2,杨国伟3,刘 晨1,2. 重叠隧道盾构施工对先建隧道影响模型试验研究[J]. 岩石力学与工程学报, 2013, 32(10): 2061-2069.
XIE Xiongyao1,2,NIU Juntao1,2,YANG Guowei3,LIU Chen1,2. MODEL TEST FOR EFFECTS OF CONSTRUCTION OF SHIELD TUNNELLING IN OVERLAPPING TUNNELS ON EXISTING TUNNEL. , 2013, 32(10): 2061-2069.
郑余朝,仇文革. 重叠隧道结构内力演变的三维弹塑性数值模拟[J].西南交通大学学报,2006,41(3):376-380.(ZHENG Yuchao,QIU Wenge. 3D elastoplastic numerical simulation of evolving regularity of structural internal force of overlapped tunnels[J]. Journal of Southwest Jiaotong University,2006,41(3):376-380.(in Chinese))