Abstract:Separated two-track tunnels of Beijing Metro Line No.4 Xuanwumen station vertically cross beneath Line No.2 Xuanwumen station. Analyzing the measured displacement of the existing station structure both from the global deformation and the single structural block displacement,we obtain the deformation law of the overlying existing structure during excavation by steps. Research shows that:(1) The existing underground structure′s integral settlement complies with Peck formula,but the displacement of single block between two movement joints is rotation mainly and presents rigid body rotation. (2) The ground loss ratio fitted by Peck formula is 0.118%–0.187%. It is unrelated to the existence of the underground structure and the size of excavation section,but it is associated with the new tunnels′ supporting time and supporting stiffness. (3) The settlement trough width coefficient fitted by Peck formula is 2.44–3.87,which is the 1.05–1.62 times than the coefficient of natural stratum. It is unrelated to supporting stiffness,but it is associated with the reinforcement method,the existence of underground structure and the size of excavation section. The research result can provide reference for the similar engineering.
张成平,张顶立,王梦恕. 大断面隧道施工引起的上覆地铁隧道结构变形分析[J]. 岩土工程学报,2009,31(5):805-810.(ZHANG Chengping,ZHANG Dingli,WANG Mengshu. Structural deformation of overlying subway tunnels induced by tunneling[J]. Chinese Journal of Geotechnical Engineering,2009,31(5):805-810.(in Chinese))
[4]
李 奎,李志业,高 波. 既有地铁车站结构安全性评估方法研究[J]. 岩土力学,2011,32(4):1 193-1 199.(LI Kui,LI Zhiye,GAO Bo. Study of safety evaluation method for existing metro station structures[J]. Rock and Soil Mechanics,2011,32(4):1 193- 1 199.(in Chinese))
Your browse does not support frame!