Abstract:In order to study the influence of shield tunneling with tunnels followed by well excavation on segment opening,under the precondition that it cannot easily be measured and tested,an elasto-plastic simulation is carried out with FEM program to analyze segment opening caused by the tunnels followed by well excavation. In combination with the typical engineering example,the influences of mechanical properties of soil,local reinforcement soil and groundwater level are discussed. The results indicate that influencing scope is mainly in five segment length near the continuous wall of work well,so analysis of seepage control during the construction should consider emphatically four joints near the work well. Segment opening is strongly impacted by the soil stiffness and it decreases with the increase of stiffness. Segment opening is not affected by soil strength index. It can use local reinforcement to effectively reduce the segment opening to prevent leakage of shield tunnel. The existence of groundwater above the segment has significant influence on segment opening,influencing scope is mainly in five segment length,but the water level has a tiny effect on segment opening. It suggests that it is necessary to perform local reinforcement in five segment length near the continuous wall of work well when adopting tunnels followed by well excavation to ensure the safety of tunnel.
杨春山,莫海鸿,陈俊生,黎 伟. 盾构隧道先隧后井工法对管片张开量影响的研究[J]. 岩石力学与工程学报, 2014, 33(sl): 2870-2877.
YANG Chunshan,MO Haihong,CHEN Junsheng,LI Wei. INFLUENCE OF SHIELD TUNNELING WITH TUNNELS FOLLOWED BY WELL EXCAVATION ON SEGMENT OPENING. , 2014, 33(sl): 2870-2877.
熊 乾. 地铁先隧后站法施工技术[J]. 铁道标准设计,2009,(12):106-111.(XIONG Qian. Construction technology of excavating tunnel firstly and then well excavation[J]. Railway Standard Design,2009,(12):106-110.(in Chinese))
Your browse does not support frame!