STUDY OF WORKING DEPTH IN PORT GROUND UNDER
HEAVY VEHICLE LOAD
ZHANG Jun1,SHEN Junmin1,GAN Tian2,YUAN Jingbo3
(1. Key Laboratory of Highway Construction and Maintenance Technology in Loess Region,Shanxi Transportation Research Institute,Taiyuan,Shanxi 030006,China;2. School of Civil Engineering and Mechanics,Huazhong University of Science and Technology,Wuhan,Hubei 430074,China;3. CCCC Forth Harbor Engineering Investigation and Design Institute Co.,Ltd.,Guangzhou,Guangdong 510230,China)
Abstract:A three-dimensional numerical simulation was conducted by FLAC3D software to simulate the field test. A model calibration was conducted to ensure that the numerical modeling was a realistic representation by the measured data. Finally,a sensitivity analysis was performed to investigate influence factors,such as the thickness of sand cushion,area of thrust surface and wheel pressure. The research results indicated that:(1) Under the vehicle load,when the ratio of additional stress to gravity stress was equal to 0.2 and 0.1,the corresponding depths were 1.63 and 2.03 m,respectively. (2) The maximum vertical strain occurred at the top of the mucky clay. (3) The lateral displacement increased first and then decreased along the depth and horizontal direction. (4) With the increase of thickness of sand cushion,the maximum vertical strain and the largest lateral displacement of the ground increased firstly and decreased lastly. (5) When the thickness of medium-coarse sand was about 1.25 m,the working depth was right at the bottom of medium-coarse sand. (6) The working depth,the maximum vertical strain and the maximum lateral displacement of ground increased with the increase of the area of thrust surface and wheel pressure.
张 军1,申俊敏1,甘 甜2,袁静波3. 重交通荷载作用下港区地基工作区深度研究[J]. 岩石力学与工程学报, 2014, 33(sl): 2942-2949.
ZHANG Jun1,SHEN Junmin1,GAN Tian2,YUAN Jingbo3. STUDY OF WORKING DEPTH IN PORT GROUND UNDER
HEAVY VEHICLE LOAD. , 2014, 33(sl): 2942-2949.
唐彤芝,董江平,黄家青,等. 薄砂层长短板结合真空预压法处理吹填淤泥土试验研究[J]. 岩土工程学报,2012,34(5):899-905. (TANG Tongzhi,DONG Jiangping,HUANG Jiaqing,et al. Experimental research on hydraulic filled mud consolidated by vacuum preloading method combining long and short boards with thin sand cushions[J]. Chinese Journal of Geotechnical Engineering,2012,34(5):899-905. (in Chinese))
[7]
童申家,蔡佳佳,辛 强,等. 考虑铺面结构下的路基工作区深度研究[J]. 公路,2012,(10):24-27.(TONG Shenjia,CAI Jiajia,XIN Qiang,et al. Research on workspace depth of roadbed with consideration of pavement structure[J]. Highway,2012,(10):24-27.(in Chinese))