RISK MANAGEMENT OF URBAN TUNNEL OF LARGE CROSS-SECTION IN WHOLE CONSTRUCTION PROCESS
LI Zhong1,2,WEI Jia1,2,ZHU Yanpeng1,2
(1. Key Laboratory of Disaster Prevention and Mitigation in Civil Engineering of Gansu Province,Lanzhou University of Technology,Lanzhou,Gansu 730050,China;2. Northwest Center for Disaster Mitigation in Civil Engineering of Ministry of Education,Lanzhou University of Technology,Lanzhou,Gansu 730050,China)
Abstract:A framework of risk management including risk identification,estimation,evaluation and control was proposed for the safety in the whole construction process of urban tunnels with large cross-sections. Taking the North Ring Road,Jiuzhou tunnel for example,the comprehensive evaluation with fuzzy method was applied to determine the set of the levels of risk factors,the set of risk evaluation and the set of membership. The risks in the whole construction process were identified,analyzed and evaluated. The risk tracking and control are achieved with the framework of risk management proposed in the whole process of construction and avoids the weakness of the scattered,dispersed,fragmented risk management mode which was used in the previous projects.
李 忠1,2,魏 嘉1,2,朱彦鹏1,2. 大断面城市隧道施工全过程风险管理模式研究[J]. 岩石力学与工程学报, 2014, 33(10): 2085-2094.
LI Zhong1,2,WEI Jia1,2,ZHU Yanpeng1,2. RISK MANAGEMENT OF URBAN TUNNEL OF LARGE CROSS-SECTION IN WHOLE CONSTRUCTION PROCESS. , 2014, 33(10): 2085-2094.
刘 婧,周 伟. 山岭隧道施工的动态风险管理模型研究[J]. 安全与环境学报,2011,11(3):195-199.(LIU Jing,ZHOU Wei. Dynamic rick management model for the construction of mountain tunnel[J]. Journal of Safety and Environment,2011,11(3):195-199.(in Chinese))
Your browse does not support frame!