Analysis of load-settlement relationship of new and old piles in natural saturated clays
LI Jingpei1,2,ZHANG Lingxiang1,2,LI Lin1,2,LIU Zhenxing3
(1. Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092,China;2. Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;3. Shanghai Changkai Geotechnical Engineering,Shanghai 200070,China)
Abstract:Due to the reconsolidation after pile installation,mechanical properties of soil around old piles are extremely different from soil around new piles. Considering pile-jacking influence and initial anisotropy properties of the natural clay and adopting an analytical solution to elastoplastic cavity expansion due to the pile jacking-in,the mechanical characteristics of soil around the new and old piles are subsequently analyzed in detail. On this basis,load transfer models are proposed for new and old piles respectively according to the different mechanical properties in this paper. The theoretical solution is verified by the field test,and the results show that the presented methods predicted accurately the load-settlement relationship of the new and old piles.
李镜培1,2,张凌翔1,2,李 林1,2,刘振兴3. 天然饱和黏土中新、旧桩荷载–沉降关系研究[J]. 岩石力学与工程学报, 2016, 35(9): 1906-1913.
LI Jingpei1,2,ZHANG Lingxiang1,2,LI Lin1,2,LIU Zhenxing3. Analysis of load-settlement relationship of new and old piles in natural saturated clays. , 2016, 35(9): 1906-1913.
王戍平. 深厚软土中PHC长桩的时效性试验研究[J]. 岩土工程学报,2003,25(2):239-241.(WANG Maoping. Study on time effect of PHC open ended pile in deep soft soil[J]. Chinese Journal of Geotechnical Engineering,2003,25(2):239-241.(in Chinese))