Abstract:The Central-Wan Chai Bypass(CWB) is a route to reduce the traffic congestion between the east and west of the densely populated Island metropolis. This paper is to review the performance of design and construction of the underground tunnel with trinocular cross section area of 460 m2 and a combined span of 50 m by sequential excavation method(SEM) in hard rock and adopting the new austrian tunneling method(NATM),together with the application of NGI Q-system allowing observational approach and optimization of temporary rock support design. The trinocular tunnel also passes 20 m beneath the southern approach ramp of the Cross-Harbour tunnel(CHT). Furthermore,the comprehensive application of several engineering measures,such as the extensive instrumentation monitoring,standby dewatering/recharging system and steel weights,to reduce the risk of flotation of the existing CHT are also discussed in this paper.
梁文添1,陈劲慧2. 新奥法在三连拱特大断面隧道施工中的应用[J]. 岩石力学与工程学报, 2017, 36(11): 2755-2766.
Tim LEUNG1,CHEN Jinhui2. Application of new Austrian tunnelling method to a large span trinocular cross section tunnel. , 2017, 36(11): 2755-2766.
PETTIFER G S,FOOKES P G. A Revision of the Graphical method for assessing the excavatability of rock quarterly[J]. Journal of Engineering Geology,1994,27(1):145-164.
Your browse does not support frame!