[22] |
GIBOWICZ S J,KIJKO A. An introduction to mining seismology[M]. San Diego,California:Academic Press Inc.,1994:15-22.
|
[6] |
黄 云,金 峰,王光纶,等. 高拱坝上游坝踵裂缝稳定性及其扩展[J]. 清华大学学报:自然科学版,2002,(4):555-559.(HUANG Yun,JIN Feng,WANG Guanglun,et al. Stability and propagation of cracks at the heel of high arch dams[J]. Journal of Tsinghua University:Nature Science,2002,(4):555-559.(in Chinese))
|
[7] |
陈胜宏,汪卫明,徐明毅,等. 小湾高拱坝坝踵开裂的有限单元法分析[J]. 水利学报,2003,(1):66-71.(CHEN Shenghong,WANG Weiming,XU Mingyi,et al. Finite element analysis of the crack propagation in high arch dam heel of Xiaowan project[J]. Journal of Hydraulic Engineering,2003,(1):66-71.(in Chinese))
|
[3] |
REN Q W,XU L Y,WAN Y H. Research advance in safety analysis methods for high concrete dam[J]. Science China Series E:Technological Sciences,2007,50(Supp.1):62-78.
|
[9] |
LIN P,ZHOU W Y,LIU H Y. Experimental study on cracking,reinforcement,and overall stability of the Xiaowan super-high arch dam[J]. Rock Mechanics and Rock Engineering,2015,48(2):819- 841.
|
[13] |
汤洪洁,张江红,陈景富. 安徽流波水电站碾压混凝土拱坝裂缝处理[J]. 水利水电技术,2012,43(7):72-74.(TANG Hongjie,ZHANG Jianghong,CHEN Jingfu. Crack treatment on roller compacted concrete arch dam of Liubo hydropower station in Anhui Province[J]. Water Resources and Hydropower Engineering,2012,43(7):72-74.(in Chinese))
|
[16] |
CHEN Y,ZHANG L,YANG B Q,et.al. Geomechanical model test on dam stability and application to Jinping high arch dam[J]. International Journal of Rock Mechanics and Mining Sciences,2015,76(1):1-9.
|
[17] |
MALLA S,WIELAND M. Analysis of an arch-gravity dam with a horizontal crack[J]. Computers and Structures,1999,72(1):267-278.
|
[19] |
马 克,金 峰,唐春安,等. 基于微震监测的大岗山高拱坝坝踵蓄水初期变形机制研究[J]. 岩石力学与工程学报,2017,36(5): 1 111-1 121.(MA Ke,JIN Feng,TANG Chun?an,et al. Deformation mechanism of the dam heel of Dagangshan high arch dam based on microseismic monitoring during initial impoundment[J]. Chinese Journal of Rock Mechanics and Engineering,2017,36(5):1 111- 1 121.(in Chinese))
|
[23] |
BOORE D M,BOATWRIGHT J. Average body-wave radiation coefficients[J]. Bulletin of the Seismological Society of America,1984,74:1 615-1 621.
|
[4] |
朱伯芳. 建设高质量永不裂缝拱坝的可行性及实现策略[J]. 水利学报,2006,(10):1 155-1 162.(ZHU Bofang. On the feasibility of building high quality arch dams without cracking and the relevant techniques[J]. Journal of Hydraulic Engineering,2006,(10):1 155- 1 162.(in Chinese))
|
[14] |
霍自民,章美文,刘亚敏,等. 四里岩水库廊道裂缝成因分析及防治措施[J]. 水利水电技术,2005,(5):78-80.(HUO Zimin,ZHANG Meiwen,LIU Yamin,et al. Analysis on cracks in gallery of dam for Siliyan reservoir[J]. Water Resources and Hydropower Engineering,2005,(5):78-80.(in Chinese))
|
[24] |
MENDECKI A J. Seismic monitoring in mines[M]. London:Chapman and Hall,1996:155-158.
|
[1] |
ZHANG G X,LIU Y,ZHOU Q J. Study on real working performance and overload safety factor of high arch dam[J]. Science China Series E:Technological Science,2008,51(Supp.2):48-59.
|
[2] |
JIN F,HU W,PAN J,et al. Comparative study procedure for the safety evaluation of high arch dams[J]. Computers and Geotechnics,2011,38(3):306-317.
|
[5] |
刘杏红,周创兵,常晓林,等. 大体积混凝土温度裂缝扩展过程模拟[J]. 岩土力学,2010,31(8):2 666-2 676.(LIU Xinghong,ZHOU Chuangbing,CHANG Xiaolin,et al. Simulation of mass concrete temperature cracking propagation process[J]. Rock and Soil Mechanics,2010,31(8):2 666-2 676.(in Chinese))
|
[8] |
何 柱,刘耀儒,杨 强,等. 基于位移反分析的小湾拱坝稳定性评价[J]. 岩石力学与工程学报,2013,32(11):2 242-2 249.(HE Zhu,LIU Yaoru,YANG Qiang,et al. Research on stability estimation of Xiaowan arch dam based on displacement back analysis[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(11):2 242-2 249.(in Chinese))
|
[10] |
WANG R K. Key Technologies in the design and construction of 300 m ultra-high arch dams[J]. Engineering,2016,2(3):350-359.
|
[11] |
WIELAND M,KIRCHEN G F. Long-term dam safety monitoring of punt dal gall arch dam in Switzerland[J]. Frontiers of Structural and Civil Engineering,2012,6(1):76-83.
|
[12] |
崔广珍,贾建宇,关育生,等. 汾河二库碾压混凝土重力坝底部廊道裂缝成因及处理措施[J]. 山西水利科技,2000,135(增):67-68. (CUI Guangzhen,JIA Jianyu,GUAN Yusheng,et al. Genesis of crack on gallery of roller compacted concrete dam of Fenhe reservoir II and treatment measures[J]. Shanxi Hydrotechnics,2000,135(Supp.):67-68.(in Chinese))
|
[15] |
吕永宁,李 涛,林潘斌,等. 沙溪口大坝19号坝段廊道裂缝成因分析及影响[J]. 大坝与安全,2007,(4):36-38.(LU Yongning,LI Tao,LIN Panbin,et al. Cause analysis and effect of gallery cracks on dam block 19 at Shaxikou dam[J]. Dam and Safety,2007,(4):36-38.(in Chinese))
|
[18] |
CHEN P P,ZHANG G X. Study on the prevention measures and causes of cracks in arch crests of galleries in high concrete dams[J]. Advanced Materials Research,2014,(3):813-819.
|
[20] |
庄端阳,唐春安,梁正召,等. 基于微震能量演化的大岗山右岸边坡抗剪洞加固效果研究[J]. 岩土工程学报,2017,39(5):868-878.(ZHUANG Duanyang,TANG Chun?an,LIANG Zhengzhao,et al. Reinforcement effect of anti-shear tunnels of Dagangshan right bank slope based on microseismic energy evolution[J]. Chinese Journal of Geotechnical Engineering,2017,39(5):868-878.(in Chinese))
|
[21] |
涂 劲,李德玉,陈厚群,等. 大岗山拱坝-地基体系整体抗震安全性研究[J]. 水利学报,2011,42(2):152-159.(TU Jing,LI Deyu,CHEN Houqun,et al. Study on integral seismic safety of Dagangshan arch dam-foundation system[J]. Journal of Hydraulic Engineering,2011,42(2):152-159.(in Chinese))
|