Abstract:With the consideration of geological conditions,the pipe-roofing method―advancing method with relay station,is used in the project of Shanghai Hongxu—Beihong road. It is the first time to use pipe-roofing method to construct tunnel in China,and it is the largest and longest pipe-roofing tunnel in saturated soft soil. There are high construction risks because of large-section culvert box,novel construction method and unfarournble geological conditions. On the basis of risk analysis theory,the construction risks,which exist in advancing precisions of pipe-roofing,earth settlement (upheaval),pipe damage,waterproof capacity of pipe-roofing,joint types,stability of excavation face,box damage,box advancing direction controlling,pipe settlement,enit safety of box,and ground deformation controlling,are discussed. Total risk level of the project is gained,and the preventing methods are presented.