Abstract:This paper selects a typical geological section of the underground powerhouse in the HuiZhou Pump-Generator Plant, Using 2D-FLAC to simulate the excavation and supporting process of the underground caverns, and the building and run of the cliff runaway girder. The stress distribution and deformation on surrounding rock mass and the cliff runaway girder through the construction period and operating period are analyzed. Based on this, the stability of the surrounding rock mass and cliff runaway girder is evaluated.
付敬;丁秀丽;张练. 惠州抽水蓄能电站地下厂房岩壁吊车梁施工期与运行期受力分析 #br#[J]. 岩石力学与工程学报, 2003, 22(S1): 2201-2205.
Fu Jing1, Ding Xiuli1, Huan Yong2. Stability Research of the Cliff Runaway Girder in the HuiZhou Pump-Generator Plant through the Construction Period and Operating Period. , 2003, 22(S1): 2201-2205.