Abstract:Contract 1.1 of Shanghai Sewerage Implementation Project II stage was a work job to cross the Huangpu River as an inverted siphon, where EP requirements have been strict, and work execution difficult. This article presents ,in particular ,the application in this project ,of the first slurry balanced pipe jacking machine in China and a study on construction parameters for slurry balanced pipe jacking operation in order to find the behavior of ground settlement caused by it.
收稿日期: 2003-03-31
引用本文:
傅德明;楼如岳. 泥水平衡顶管施工及参数研究 #br#[J]. 岩石力学与工程学报, 2003, 22(S1): 2493-2501.
By Fu, Deming; Lou, Ruyue. Study On Slurry Balanced Pipe Jacking Construction & Its Parameters. , 2003, 22(S1): 2493-2501.