GROUTING TEST AND QUALITY ASSESSMENT OF ROCKMASS FOR DAM SITE OF DALIUSHU WATER PROJECT
Chai Shouxi1,2,Wang Yinmei1,Wang Junguo1
(1Research Institute of Geological Engineering,Lanzhou University, Lanzhou 730000 China) (2Department of Civil Engineering,Tianjin Institute of Urban Construction, Tianjin 300381 China)
Abstract:The cement consumption per meter,quality of rock mass,wave velocity,land upheaval,stress status of rock mass,and the relationship among them during and after two grouting tests are discussed in the paper. The rather poor quality of relaxed rockmass results in more cement consumption in grouting test. It is certified further that the rockmass in dam site loosened extensively.
柴寿喜;王银梅;王君国. 大柳树坝址灌浆试验与岩体质量[J]. 岩石力学与工程学报, 2003, 22(S2): 2555-2558.
Chai Shouxi1,2,Wang Yinmei1,Wang Junguo1. GROUTING TEST AND QUALITY ASSESSMENT OF ROCKMASS FOR DAM SITE OF DALIUSHU WATER PROJECT. , 2003, 22(S2): 2555-2558.