Abstract:The stability of stope wall rock and obsturator is a key issue for the safty of the second stage minimg in Jinchuan no.2 digging. As mining depth of the stope area and geopressure increase,stope wall rock and obsturator are of the possibility of serious yielding destruction and whole instability. In order to forecast the stability condition of wall rock and obsturator,a series of methods are applied to monitoring deformation,among which convergence monitoring is one of the main methods. The arrangement of laneway convergence monitoring net,monitoring project and monitoring result are presented,and some meaningful conclusions are obtained.
鲁全胜;高谦. 金川二矿区采场巷道围岩与充填体收敛变形监测研究[J]. 岩石力学与工程学报, 2003, 22(S2): 2633-2638.
Lu Quansheng1,Gao Qian2. MONITORING RESEARCH ON CONVERGENCE DEFORMATION OF LANEWAY WAY ROCK AND OBSTURATOR IN NO.2 DIGGING OF JINCHUAN. , 2003, 22(S2): 2633-2638.