INTELLIGENT AND DYNAMIC DESIGN METHOD OF LARGE CAVERN GROUP AND ITS PRACTICE
(1. State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan,Hubei 430071,China;2. HydroChina Huadong Engineering Corporation,Hangzhou,Zhejiang 310014,China;3. Ertan Hydropower Development Co.,Ltd.,Chengdu,Sichuan 610051,China)
Abstract:Focusing on characteristics of strong excavation unloading of high sidewalls of multi-cavern group under complicated geological conditions,an intelligent and dynamic design method is proposed for the stability analysis,design and construction of large cavern group. The method aims at the safe and economic construction for the large cavern group under complicated geological conditions. It considers the entire system?s process from recognition of geological conditions,back analysis of in-situ stress field,understanding of deformation and failure mechanism of surrounding rock of large cavern group,stability analysis,global optimization of control measures of the stability such as excavation procedure and support parameters of cavern group,and dynamic adjustment of the excavation procedure and support parameters during the construction. The method has been in good practice of design and construction of underground powerhouse at Jinping II hydropower station. The results show that it is reliable information,intelligent and scientific method for design and construction of large cavern group.
冯夏庭1,江 权1,向天兵1,张春生2,吴世勇3. 大型洞室群智能动态设计方法及其实践[J]. 岩石力学与工程学报, 2011, 30(3): 433-448.
FENG Xiating1,JIANG Quan1,XIANG Tianbing1,ZHANG Chunsheng2,WU Shiyong3. INTELLIGENT AND DYNAMIC DESIGN METHOD OF LARGE CAVERN GROUP AND ITS PRACTICE. , 2011, 30(3): 433-448.