STUDY OF PROCESS DESIGN METHOD OF LARGE CROSS-SECTION ROAD TUNNEL
ZHU Hehua1,QU Haifeng2,CAI Yongchang1,HUANG Feng1
(1. Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092,China;2. Shanghai Investment Consulting Corporation,Shanghai 200003,China)
Abstract:Process design method(PDM) of road tunnel with large cross-section is introduced according to the in-situ test study and finite element method(FEM) numerical simulation analysis of road tunnels in Longtoushan and Lanfeng,while the correlative practical mode is built subsequently. PDM is established based on the load-structure design method,and the loose load zone is defined by maximum tension strain of surrounding rock. PDM emphasizes more consideration about effect of a tunnel construction process,which is very different from both traditional road tunnel design codes and Протодъякнов?s(PUSI) theory. PDM optimizes the comparatively conservative support parameters by common design method,at the same time,of course can ensure the tunnel be at a whole safe state. Two engineering applications with different construction methods:double and single side-wall drift pilot excavations are studied,and the results show that PDM is more credible and practical than usual state one,and is better fit for the in-situ construction of tunnels with large cross-section. The results from this paper are in favor of advancing more efficient and reasonable design method of road tunnel with large cross-section,as well as to promote the current design level.
PALMSTRÖM A. Recent developments in rock support estimates by the RMI[J]. Journal of Rock Mechanics and Tunneling Technology,2000,6(1):1-19.
Your browse does not support frame!