(1. Shenzhen Geotechnical Investigation and Surveying Institute Co.,Ltd.,Shenzhen,Guangdong 518028,China;
2. School of Mechanics and Architecture Engineering,China University of Mining and Technology,Beijing 100083,China)
Abstract:In the construction of the extra-deep foundation pit of Shenzhen Ping?an Financial Center,the maximum excavated depth is over 30 m and the minimum distance to metro structures is just 5.3 m. Some of the super-large digging piles will be constructed subsequently with the top opening diameter of 9.5 m. The maximum depth for piles construction is 68 m below the ground surface. Therefore,it is key to consider and control the settlement of metro structures during the pile construction. Based on the actual construction conditions,the three-dimensional numerical simulation method was used for analysis of digging piles construction. Hereby,a series of significant countermeasures were proposed and performed before pile constructions to reduce the excessive settlement,such as high-pressure jet grouting and curtain grouting according to geological conditions. The settlement values monitored increased slightly and matched well with the predicted results after the completion of digging piles,which indicates a better controlling of metro structure deformation contributed by the effective countermeasures.
[1] OU C Y,LIAO J T,CHENG W L. Building response and ground movements induced by a deep excavation[J]. Geotechnique,2000,50(3):209–220.
[2] YOO C,LEE D. Deep excavation-induced ground surface movement characteristics—a numerical investigation[J]. Computers and Geotechnics,2008,35(2):231–252.
[3] OU C Y,HSIEH P G,CHIOU D C. Characteristics of ground surface settlement during excavation[J]. Canadian Geotechnical Journal,1993,30(5):758–767.
[4] SON M ,CORDING E J. Estimation of building damage due to excavation-induced ground movements[J]. Journal of Geotechnical and Geoenvironmental Engineering,2005,131(2):162–177.
[5] BOSCARDIN M D,CORDING E J. Building response to excavation- induced settlement[J]. Journal of Geotechnical and Geoenvironmental Engineering,1989,115(1):1–21.
[6] 吉茂杰,刘国彬. 开挖卸荷引起地铁隧道位移的预测方法[J]. 同济大学学报:自然科学版,2001,29(5):531–535.(JI Maojie,LIU Guobin. Prediction method of displacement due to excavation[J]. Journal of Tongji University:Natural Science,2001,29(5):531–535.(in Chinese))
[7] CHAN C W. Displacement of MRT tunnels due to an adjacent excavation[Ph. D. Thesis][D]. Singapore:Nanyang Technological University,1995.
[8] DOLEZALOVA M. Tunnel complex unloaded by a deep excavation[J]. Computers and Geotechnics,2001,28(6/7):469–493.
[9] SHARMA J S,HEFNY A M,ZHAO J,et al. Dynamic effects in concrete materials[J]. Tunnelling and Underground Space Technology,2001,16(2):93–98.
[10] 王卫东,吴江斌,翁其平. 基坑开挖卸载对地铁区间隧道影响的数值模拟[J]. 岩土力学,2004,25(增2):251–255.(WANG Weidong,WU Jiangbin,WENG Qiping. Numerical modeling of affection of foundation pit excavation on metro tunnel[J]. Rock and Soil Mechanics,2004,25(Supp.2):251–255.(in Chinese))
[11] 王卫东,沈 健,翁其平,等. 基坑工程对邻近地铁隧道影响的分析与对策[J]. 岩土工程学报,2006,28(增):1 340–1 345.(WANG Weidong,SHEN Jian,WENG Qiping,et al. Analysis and countermeasures of influence of excavation on adjacent tunnels[J]. Chinese Journal of Geotechnical Engineering,2006,28(Supp.):1 340–1 345.(in Chinese))