MECHANICAL ANALYSIS OF SEGMENT FLOATING DURING SHIELD TUNNEL CONSTRUCTION
WEI Gang1,HONG Jie2,WEI Xinjiang1,2
(1. Department of Civil Engineering,Zhejiang University City College,Hangzhou,Zhejiang 310015,China;
2. Institute of Geotechnical Engineering,Zhejiang University,Hangzhou,Zhejiang 310058,China)
Abstract:The lining segment is in a complex stress state during shield tunnel construction,which is prone to go dislocation and have wholly rising displacement. Based on the analysis of segment in grouting section and considering static buoyancy and dynamic buoyancy,the buoyancy is respectively analyzed during shield tunnel construction. The mechanical model for segment ring in floating phase and calculation formula are presented,respectively. Aiming at the difference of segment ring between normal design state and floating state,the modified routine method is carried out to calculate lining internal force to draw a comparison. The results show that,comparing with segment ring in the normal design state,the bending moment,shear force and axial force values of segment increase by 60%,51% and 46% in floating state,which indicates that segment floating is adverse to its safety. The stress of segment is affected by dynamic buoyancy greatly during construction stage,which is larger than static buoyancy and must controlled reasonably for preventing the segment fracture.
沈征难. 盾构掘进过程中隧道管片上浮原因分析及控制[J]. 现代隧道技术,2004,41(6):51-56.(SHEN Zhengnan. Analysis and control of segment floating during shield tunnel construction[J]. Modern Tunnelling Technology,2004,41(6):51-56.(in Chinese))
[3]
李云丽. 盾构隧道施工过程管片结构受力特征研究[硕士学位论文][D]. 北京:北京交通大学,2008.(LI Yunli. Research on structural mechanics characteristics of segment in the process of shield tunnel construction[M. S. Thesis][D]. Beijing:Beijing Jiaotong University,2008.(in Chinese))
Your browse does not support frame!