(State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese
Academy of Sciences,Wuhan,Hubei 430071,China)
Abstract:According to mechanism,characterization and law of rockburst evolution process,a three-step strategy to control rockburst was firstly proposed. It includes the first step to optimize excavation schemes to reduce concentration of stress and energy induced by the excavation;the second step to pre-release and transfer energy concentration;and the third step to absorb energy stored in rock mass by designing reasonable rockbolts and other support types. And then a dynamic control method of rockburst evolution process is proposed. During the construction,the real-time microseismicity monitoring is used to perform warning of rockburst. The feedback analysis and dynamic control strategy if needed can be conducted to perform the three-step control strategy of rockburst evolution process. The proposed method has been successfully used in Jinping II deep headrace and water drainage tunnels with depths of 1 900–2 525 m. The practice verified the applicability of the proposed method.
[1] ROBERTS M,BRUMMER R K. Support requirements in rockburst conditions[J]. Journal of the South African Institute of Mining and Metallurgy,1988,88(3):97–104.
[2] STACEY T R,ORTLEPP W D,KIRSTEN H. Energy-absorbing capacity of reinforced shotcrete,with reference to the containment of rockburst damage[J]. Journal of the South African Institute of Mining and Metallurgy,1995,95(3):137–140.
[3] KAISER P K,MCCREATH D R,TANNANT D D. Canadian Rockburst Support Handboo[R]. Sudbury:Geomechanics Research Centre,Laurentian University,1996.
[4] ORTLEPP W D,BORNMAN J J,ERASMUS P N. The Durabar–a yieldable support tendon-design rational and laboratory results[C]// Rockbursts and Seismicity in Mines(RaSiM5). Johannesburg:South African Inst of Mining and Metallurgy,2001:263–266.
[5] STACEY T R,ORTLEPP W D. Tunnel surface support - capacities of various types of wire mesh and shotcrete under dynamic loading[J]. Journal of the South African Institute of Mining and Metallurgy,2001,101(7):337–342.
[6] 万姜林,洪开荣. 太平驿水电站引水隧洞的岩爆及其防治[J]. 西部探矿工程,1995,7(1):87–89.(WAN Jianglin,HONG Kairong. Rockburst of division channel of Taipingyi hydroelectric station and its control[J]. West-China Exploration Engineering,1995,7(1):87–89.(in Chinese))
[7] 李春杰,李洪奇. 秦岭隧道岩爆特征与施工处理[J]. 世界隧道,1999,5(1):36–41.(LI Chunjie,LI Hongqi. Rockburst characteristics and treatment methods in Qinling tunnel[J]. Modern Tunnelling Technology,1999,5(1):36–41.(in Chinese))
[8] 徐林生. 二郎山公路隧道岩爆特征与防治措施的研究[J]. 土木工程学报,2004,37(1):61–64.(XU Linsheng. Research of rockburst character and prevention measure in Erlang mountain highway tunnel[J]. China Civil Engineering Journal,2004,37(1):61–64.(in Chinese))
[9] 李 忠,刘志刚,曲力群. 岩爆防治在大伙房引水隧道中的应用[J]. 辽宁工程技术大学学报,2004,23(2):197–199.(LI Zhong,LIU Zhigang,QU Liqun. Application of prevention of rockburst in Dahuofang tunnel[J]. Journal of Liaoning Technical University,2004,23(2):197–199.(in Chinese))
[10] 李 忠,杨腾峰. 福建九华山隧道岩爆工程地质特征分析与防治措施研究[J]. 地质与勘探,2005,41(2):81–84.(LI Zhong,YANG Tengfeng. The geological characters of rock-burst in Jiuhuashan tunnel and the prevention methods[J]. Geology and Prospecting,2005,41(2):81–84.(in Chinese))
[11] 吴德兴,杨 健. 苍岭特长公路隧道岩爆预测和工程对策[J]. 岩石力学与工程学报,2005,24(21):3 965–3 971.(WU Dexing,YANG Jian. Prediction and countermeasure for rockburst in Cangling mountain highway tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(21):3 965–3 971.(in Chinese))
[12] 汪 琦,唐义彬,李 忠. 浙江苍岭隧道岩爆工程地质特征分析与防治措施研究[J]. 工程地质学报,2006,14(2):276–280.(WANG Qi,TANG Yibin,LI Zhong. Engineering geological characteristics and prevention measures for rockbursts in Cangling tunnel,Zhejiang Province[J]. Journal of Engineering Geology,2006,14(2):276–280.(in Chinese))
[13] 张 杰,董祥丽. 终南山公路隧道岩爆特征与处理措施[J]. 山西建筑,2007,33(31):317–318.(ZHANG Jie,DONG Xiangli. Character of rock burst and countermeasure in Zhongnanshan highway tunnel[J]. Shanxi Architecture,2007,33(31):317–318.(in Chinese))
[14] 张镜剑,傅冰骏. 岩爆及其判据和防治[J]. 岩石力学与工程学报,2008,27(10):2 034–2 042.(ZHANG Jingjian,FU Bingjun. Rockburst and its criteria and control[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(10):2 034–2 042.(in Chinese))
[15] 唐义彬. 浙江苍岭隧道岩爆工程地质特征分析与防治措施研究[J]. 铁道建筑技术,2009,(5):57–64.(TANG Yibin. The geological feature analysis and the prevention measure study of rock burst project in Zhejiang Cangling tunnel[J]. Railway Construction Technology,2009,(5):57–64.(in Chinese))
[16] LI S J,FENG X T,LI Z H,et al. In-situ tests on pregnancy and evolution of rock burst in a deeply buried tunnel[J]. International Journal of Rock Mechanics and Mining Sciences,2012(to be pressed).
[17] 李邵军,冯夏庭,张春生,等. 深埋隧洞TBM开挖损伤区形成与演化过程的数字钻孔摄像观测与分析[J]. 岩石力学与工程学报,2010,29(6):1 106–1 112.(LI Shaojun,FENG Xiating,ZHANG Chunsheng,et al. Testing on formation and evolution of TBM excavation damaged zone in deep-buried tunnel based on digital panoramic borehole camera technique[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(6):1 106–1 112.(in Chinese))
[18] 陈炳瑞,冯夏庭,肖亚勋,等. 深埋隧洞TBM施工过程围岩损伤演化声发射试验[J]. 岩石力学与工程学报,2010,29(8):1 562– 1 569.(CHEN Bingrui,FENG Xiating,XIAO Yaxun,et al. Acoustic emission test on damage evolution of surrounding rock in deep-buried tunnel during TBM excavation[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(8):1 562–1 569.(in Chinese))
[19] 陈炳瑞,冯夏庭,曾雄辉,等. 深埋隧洞TBM掘进微震实时监测与特征分析[J]. 岩石力学与工程学报,2011,30(2):275–283. (CHEN Bingrui,FENG Xiating,ZENG Xionghui,et al. Real-time microseismic monitoring and its characteristic analysis during TBM tunneling in deep-buried tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(2):275–283.(in Chinese))
[20] 明华军,冯夏庭,陈炳瑞,等. 基于矩张量的深埋隧洞岩爆机制分析[J]. 岩土力学,2012(待刊).(MING Huajun,FENG Xiating,CHEN Bingrui,et al. Rockburst mechanism analysis of deep tunnel based on moment tensor[J]. Rock and Soil Mechanics,2012(to be pressed).(in Chinese))
[21] 冯夏庭,陈炳瑞,明华军,等. 深埋隧洞岩爆孕育规律与机制:即时型岩爆[J]. 岩石力学与工程学报,2012,31(3):433–444.(FENG Xiating,CHEN Bingrui,MING Huajun,et al. Evolution law and mechanism of rockbursts in deep tunnels:immediate rockburst[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(3):433–444.(in Chinese))
[22] 陈炳瑞,冯夏庭,明华军,等. 深埋隧洞岩爆孕育规律与机制:时滞型岩爆[J]. 岩石力学与工程学报,2012,31(3):561–569.(CHEN Bingrui,FENG Xiating,MING Huajun,et al. Evolution law and mechanism of rockburst in deep tunnel:time delayed rockburst[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(3):561–569.(in Chinese))
[23] FENG X T,HUDSON J. Rock engineering design[M]. Leiden:CRC Press/Balkema,2011:263.
[24] 邱士利,冯夏庭,张传庆,等. 不同卸围压速率下深埋大理岩卸荷力学特性试验研究[J]. 岩石力学与工程学报,2010,29(9):1 807–1 817.(QIU Shili,FENG Xiating,ZHANG Chuanqing,et al. Experimental research on mechanical properties of deep-buried marble under different unloading rates of confining pressures[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(9):1 807–1 817.(in Chinese))
[25] ZHANG C,FENG X T,ZHOU H,et al. A top pilot tunnel preconditioning method for the prevention of extremely intense rockbursts in deep tunnels excavated by TBMs[J]. Rock Mechanics and Rock Engineering,2012,45(2):289–309.
[26] 邱士利,冯夏庭,张传庆,等. 深埋硬岩隧洞岩爆倾向性指标RVI的建立及验证[J]. 岩石力学与工程学报,2011,30(6):1 126–1 141. (QIU Shili,FENG Xiating,ZHANG Chuanqing,et al. Development and validation of rockburst vulnerability index(RVI) in deep hard rock tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(6):1 126–1 141.(in Chinese))
[27] 吴文平. 深埋硬岩隧洞支护优化设计方法研究[博士学位论文][D]. 武汉:中国科学院武汉岩土力学研究所,2011.(WU Wenping. Study on optimization design of supporting system for deep tunnel in hard rock[Ph. D. Thesis][D]. Wuhan:Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,2011.(in Chinese))