RESEARCH ON MEASUREMENT METHOD FOR STRESS OF ROCK EXCAVATION SURFACE UNDER EXTRA-HIGH STRESS
AI Kai,YIN Jianmin,LIU Yuankun,LI Yongsong,WANG Jie
(Key Laboratory of Geotechnical Mechanics and Engineering of Ministry of Water Resources,Yangtze River Scientific Research Institute,Wuhan,Hubei 430010,China)
Abstract:For the limitations of current in-situ stress measuring methods when they are carried out in high in-situ stress conditions( >0.5),a new goestress measurement method called based on partly restoration slot relief method is proposed to measure in-situ surrounding rock stress in high stress condition,and its feasibility is illustrated by theoretical model. This new method was applied at an experimental tunnel in Jinping II hydropower station,China;and the measured maximum stress is 80 MPa. When the test is carried out,it is not need to obtain intact rock core,meanwhile,the instruments of extra-high pressure is not requried. The device of this method is light weight,the operation is easy and quickly. It can be used to measure in-situ rock stress in high stress condition. it provides measured stress for prevention of the cavern rockburst and slope treatment.
艾 凯,尹健民,刘元坤,李永松,汪 洁. 极高应力条件下岩体开挖面应力测量方法研究[J]. 岩石力学与工程学报, 2012, 31(s2): 3974-3980.
AI Kai,YIN Jianmin,LIU Yuankun,LI Yongsong,WANG Jie . RESEARCH ON MEASUREMENT METHOD FOR STRESS OF ROCK EXCAVATION SURFACE UNDER EXTRA-HIGH STRESS. , 2012, 31(s2): 3974-3980.
[1] 蔡美峰,乔 兰,余 波,等. 金川二矿区深部地应力测量及其分布规律研究[J]. 岩石力学与工程学报,1998,18(4):414–418.(CAI Meifeng,QIAO Lan,YU Bo,et al. Results and analysis of in-situ stress measurement at deep position of No.2 mining area of Jinchuan mine[J]. Chinese Journal of Rock Mechanics and Engineering,1998,18(4);414–418.(in Chinese))
[2] 史红光. 二滩水电站左岸导流洞岩爆分析[J]. 水电站设计,1995,11(1):35–40.(SHI Hongguang. Rockburst analysis in Ertan hydropower plant?s diversion tunnel[J]. Design of Hydroelectric Power Station,1995,11(1):35–40.(in Chinese))
[3] 王思敬. 中国岩石力学与工程的世纪成就与历史使命[J]. 岩石力学与工程学报,2003,22(6):867–871.(WANG Sijing. Century achievements and new hierarchical mission of rock mechanics and engineering in China[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(6):867–871.(in Chinese))
[4] 张镜剑,傅冰骏. 岩爆及其判据和防治[J]. 岩石力学与工程学报,2008,27(10):2 034–2 042.(ZHANG Jingjian,FU Bingjun. Rockburst and its criteria and control[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(10):2 034–2 042.(in Chinese))
[5] 周 华,王国进,傅少君,等. 小湾拱坝坝基开挖卸荷松弛效应的有限元分析[J]. 岩土力学,2009,30(4):1 175–1 180.(ZHOU Hua,WANG Guojin,FU Shaojun,et al. Finite element analysis of foundation unloading and relaxation effects of Xiaowan arch dam[J]. Rock and Soil Mechanics,2009,30(4):1 175–1 180.(in Chinese))
[6] 刘允芳. 岩体地应力与工程建设[M]. 武汉:湖北科学技术出版社,2000:1–215.(LIU Yunfang. Geostress and engineering construction[M]. Wuhan:Hubei Scientific and Technological Press,2000:1–215.(in Chinese))
[7] 蔡美峰,乔 兰,李华斌. 地应力测量原理和技术[M]. 北京:科学出版社,1995:1–169.(CAI Meifeng,QIAO Lan,LI Huabin. Rock stress measurement principles and techniques[M]. Beijing:Science Press,1995:1–169.(in Chinese))
[8] LEEMAN E R,HAYES D I. A technique for determining the complete state of stress in rock using a single borehole[C]// Proceedings of the First International Congress on Rock Mechanics. Lisboa:[s.n.],1966:17–24.
[9] LEEMAN E R. The determination of the complete state of stress in rock using a single borehole—laboratory and underground measurements[J]. International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts,1968,5(1):31–56.
[10] SUGAWARA K,OBARA Y. Draft ISRM suggested method for in situ stress measurement using the compact conical—ended borehole overcoming(CCBO)technique[J]. International Journal of Rock Mechanics and Mining Sciences,1999,36(3):307–322.
[11] 葛修润,侯明勋. 一种测定深部岩体地应力的新方法——钻孔局部壁面应力全解除法[J]. 岩石力学与工程学报,2004,23(12):3 923–3 927.(GE Xiurun,HOU Mingxun. New approach to measure goestress—local borehole-wall complete stress relief method[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(12):3 923–3 927.(in Chinese))
[12] HAIMSON B C,CORNET F H. ISRM Suggested Methods for rock stress estimation—part 3:hydraulic fracturing(HF)and/or hydraulic testing of pre-existing fractures(HTPF)[J]. International Journal of Rock Mechanics and Mining Sciences,2003,40(7/8):1 011–1 020.
[13] CORTHEÂSY R,GUANG He,GILL D E,et al. A stress calculation model for the 3D borehole slotter[J]. International Journal of Rock Mechanics and Mining Sciences,1999,36(3):493–508.
[14] 周小平,王建华. 测量地应力的新方法[J]. 岩土力学,2002,23(3):316–320.(ZHOU Xiaoping,WANG Jianhua. The new method to measure geostress of rock mass[J]. Rock and Soil Mechanics,2002,23(3):316–320.(in Chinese))
[15] 胡 斌,章 光,李光煜. 一次套钻确定三维地应力的新型钻孔变形计[J]. 岩土力学,2006,27(5):816–822.(HU Bin,ZHANG Guang,LI Guangyu. Determining 3D in-situ stress with a new borehole deformeter by single overcore[J]. Rock and Soil Mechanics,2006,27(5):816–822.(in Chinese))
[16] 刘允芳,朱杰兵,刘元坤. 空心包体式钻孔三向应变计地应力测量的研究[J]. 岩石力学与工程学报,2001,20(4):448–453.(LIU Yunfang,ZHU Jiebing,LIU Yuankun. Research on hollow inclusion triaxial strain gauge for geostress measurement[J]. Chinese Journal of Rock Mechanics and Engineering,2001,20(4):448–453.(in Chinese))
[17] 吕颖慧,刘泉声,江 浩. 基于高应力下花岗岩卸荷试验的力学变形特性研究[J]. 岩土力学,2010,31(2):337–344.(LU Yinghui,LIU Quansheng,JIANG Hao. Study of mechanical deformation characteristics of granite in unloading experiments of high stress[J]. Rock and Soil Mechanics,2010,31(2):337–344.(in Chinese))