RESEARCH ON POST-CONSTRUCTION SURFACE SETTLEMENT CAUSED BY SHIELD TUNNELING
WEI Gang1,ZHOU Yang2,WEI Xinjiang1
(1. Department of Civil Engineering,Zhejiang University City College,Hangzhou,Zhejiang 310015,China;
2. College of Civil Engineering and Architecture,Zhejiang University,Hangzhou,Zhejiang 310058,China)
Abstract:Excess pore pressure and post-construction consolidation settlement of soil above tunnel axis caused by shield tunneling were studied. A calculation method for stress release rate caused by shield tunneling was put forward. Based on the Henkel pore water pressure theory,the excess pore water pressure of soil adjacent to the tunnel lining was deduced. Supposing that the points around the lining have the same stress release rate,the calculating method for excess pore water pressure of soil at tunnel arch crown was obtained. Using the theory of stress transfer,the distribution mode of excess pore water pressure above the tunnel axis was proposed. Assuming that the thickness of compressed soil equals that of the soil above tunnel,the theoretical calculation formula for consolidation settlement of ground above the tunnel axis was suggested based on Terzaghi?s one-dimensional consolidation theory. The results of case study show that the calculated results are in good agreement with the measured data.
郑永来,李美利,王明洋,等. 软土隧道渗漏对隧道及地面沉降影响研究[J]. 岩土工程学报,2005,27(2):243-247.(ZHENG Yonglai,LI Meili,WANG Mingyang,et al. Study on influence of seepage of metro tunnels in soft soil on the settlements of tunnels and ground[J]. Chinese Journal of Geotechnical Engineering,2005,27(2):243-247. (in Chinese))
[3]
张金菊. 盾构隧道引起土体变形分析研究[硕士学位论文][D]. 杭州:浙江大学,2006.(ZHANG Jinju. Study on soil deformation analysis induced by shield tunnel[Ph. D. Thesis][D]. Hangzhou:Zhejiang University,2006.(in Chinese))
Your browse does not support frame!