(1. School of Civil Engineering,Southwest Jiaotong University,Chengdu,Sichuan 610031,China;2. Faculty of Civil and Transportation Engineering,Guangdong University of Technology,Guangzhou,Guangdong 510006,China)
Abstract:In order to study the performance of rock-anchor system under repeated load,two tests were carried out. In the tests,the rock-anchor system was modelled by anchoring steel bar into concrete block;and then repeated load was acted on the system. From the tests,a full relation between load and displacement for the system has been obtained. By using embedded foil strain gauges,bond shear stresses were measured and the distribution of bond shear stress along the bar was achieved. The test results show that both specimens fail in anchor body pulling out from grout body. For the purpose to describe this phenomenon,a load-displacement constitutive relationship with four phases is developed on the strength of previous research. Based on the results,the reasons for bond stress change are discussed;and design recommendations based on critical displacements in different phases are suggested.
张建经1,廖蔚茗1,欧阳芳1,曲宏略1,谈一平2. 重复荷载作用下岩锚体系力学特性和黏结性能试验研究[J]. 岩石力学与工程学报, 2013, 32(4): 829-834.
ZHANG Jianjing1,LIAO Weiming1,OUYANG Fang1,QU Honglue1,TAN Yiping2. EXPERIMENTAL RESEARCH ON MECHANICAL BEHAVIOR AND
BOND PERFORMANCE OF ROCK-ANCHOR SYSTEM
SUBJECTED TO REPEATED LOAD. , 2013, 32(4): 829-834.
[1] 何思明,李新坡. 预应力锚杆作用机制研究[J]. 岩石力学与工程学报,2006,25(9):1 876–1 880.(HE Siming,LI Xinpo. Study on mechanism of prestressed anchor bolt[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(9):1 876–1 880.(in Chinese))
[2] PHILLIPS S H E. Factor affecting the design of anchorages in rock[R]. London:Cementation Research Ltd.,1970.
[3] WU Z M,YANG S T,HU X Z,et al. Analytical method for pullout of anchor from anchor-mortar-concrete anchorage system due to shear failure of mortar[J]. Journal of Engineering Mechanics,ASCE,2007,133(12):1 352–1 369.
[4] BLANCO M L,HADJ-HASSEN F,TIJANI M. A new experimental and analytical study of fully grouted rockbolts[C]// Proceedings of the 45th US Rock Mechanics/Geomechanics Symposium. San Francisco:[s. n.],2011:1–70.
[5] REN F F,YANG Z J,CHEN J F,et al. An analytical analysis of the full-range behavior of grouted rockbolts based on a tri-linear bond-slip model[J]. Construction and Building Materials,2010,24(2):361–370.
[6] 尤春安,战玉宝. 预应力锚索锚固段的应力分布规律及分析[J]. 岩石力学与工程学报,2005,24(6):925–928.(YOU Chun?an,ZHAN Yubao. Distributing characters and analysis of stresses in prestressed cables[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(6):925–928.(in Chinese)).
[7] 罗卫华,胡毅夫,张爱民. 预应力锚杆内锚固段锚固特性及参数影响分析[J]. 地下空间与工程学报,2011,7(2):269–275.(LUO Weihua,HU Yifu,ZHANG Aiming. Analysis of anchored characteristics and parameters effect of interior anchored section in prestressed anchor[J]. Chinese Journal of Underground Space and Engineering,2011,7(2):269–275.(in Chinese))
[8] 尤春安,高 明,张利民,等. 锚固体应力分布的试验研究[J]. 岩土力学,2004,25(增):63–66.(YOU Chun?an,GAO Ming,ZHANG Limin,et al. Experimental research on stress distribution in anchorage body[J]. Rock and Soil Mechanics,2004,25(Supp.):63–66.(in Chinese))
[9] 尤春安,战玉宝. 预应力锚索锚固段界面滑移的细观力学分析[J].岩石力学与工程学报,2009,28(10):1 976–1 985.(YOU Chun?an,ZHAN Yubao. Analysis of interfacial slip mesomechanics in anchorage section of prestressed anchor cable[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(10):1 976–1 985.(in Chinese))
[10] 王 博,白国良,李 坚,等. 钢筋与再生混凝土黏结应力分布的试验研究及理论分析[J]. 工业建筑,2012,42(4):10–14.(WANG Bo,BAI Guoliang,LI Jian,et al. Experimental and theoretical analysis of bond stress distribution between the rebar and the recycled concrete[J]. Industrial Construction,2012,42(4):10–14.(in Chinese)
[11] 尤春安. 全长黏结式锚杆的受力分析[J]. 岩石力学与工程学报,2000,19(3):339–341.(YOU Chun?an. Mechanical analysis of wholly grouted anchor[J]. Chinese Journal of Rock Mechanics and Engineering,2000,19(3):339–341.(in Chinese))