MODEL TEST OF EXCAVATION FACE STABILITY OF EPB SHIELD IN SANDY COBBLE GROUND AND ADJACENT BUILDING EFFECT
FAN Zuowen1,2,ZHANG Zixin1,2
(1. Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092,China;2. Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China)
Abstract:The shield tunneling technology has been widely used in the construction in sandy cobble ground, which has very strong uncertainty characteristics. The excavation face stability and the ground settlement are the key problems in the shield tunneling. In order to simulate the construction of earth pressure balance(EPB) shield tunneling,an indoor model test with different cover depths is applied to find out the law of limit support pressure on excavation face,soil arch effect and ground settlement in sand cobble ground of Beijing under the influence of adjacent buildings with flexible shallow foundation. The support pressure is unsymmetrical and the ground settlement is larger than the theoretical value by Peck equation under the influence of adjacent buildings. The results would be beneficial to guide the construction of EPB shield tunneling in sandy cobble ground.
范祚文1,2,张子新1,2. 砂卵石地层土压力平衡盾构施工开挖面稳定及邻近建筑物影响模型试验研究[J]. 岩石力学与工程学报, 2013, 32(12): 2506-2512.
FAN Zuowen1,2,ZHANG Zixin1,2. MODEL TEST OF EXCAVATION FACE STABILITY OF EPB SHIELD IN SANDY COBBLE GROUND AND ADJACENT BUILDING EFFECT. , 2013, 32(12): 2506-2512.
刘建航,侯学渊. 盾构法隧道[M]. 北京:中国铁道出版社,1991:1-22.(LIU Jianhang,HOU Xueyuan. Shield driven tunnel[M]. Beijing:China Railway Publishing House,1991:1-22.(in Chinese))