[3] |
丁德民,马凤山,张亚民,等. 急倾斜矿体分步充填开采对地表沉陷的影响[J]. 采矿与安全工程学报,2010,27(2):249-254.(DING Demin,MA Fengshan,ZHANG Yamin,et al. Effect of multi-step back filling of steep orebody on ground surface subsidence[J]. Journal of Mining and Safety Engineering,2010,27(2):249-254.(in Chinese))
|
[13] |
BADRI A,NADEAU S,GBODOSSOU A. A new practical approach to risk management for underground mining project in Quebec[J]. Journal of Loss Prevention in the Process Industries,2013,26(6): 1 145-1 158.
|
[15] |
黄建文,李建林,周宜红. 基于AHP的模糊评判法在边坡稳定性评价中的应用[J]. 岩石力学与工程学报,2007,26(增1):2 627- 2 632.(HUANG Jianwen,LI Jianlin,ZHOU Yihong. Application of fuzzy analysis based on AHP to slope stability evaluation[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(Supp.1): 2 627-2 632.(in Chinese))
|
[17] |
SAATY T L. Relative measurement and its generalization in decision making why pairwise comparisons are central in mathematics for the measurement of intangible factors the analytic hierarchy/network process[J]. RACSAM-Revista de la Real Academia de Ciencias Exactas,Fisicas y Naturales Serie A Matematicas,2008,102(2):251-318.
|
[19] |
朱合华,张 琦,章连洋. Hoek-Brown强度准则研究进展与应用综述[J]. 岩石力学与工程学报,2013,32(10):1 945-1 963.(ZHU Hehua,ZHANG Qi,ZHANG Lianyang. Review of research progresses and applocations of Hoek-Brown strength criterion[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(10):1 945-1 963.(in Chinese))
|
[4] |
彭府华,李庶林,李小强,等. 金川二矿区大体积充填体变形机制与变形监测研究[J]. 岩石力学与工程学报,2015,34(1):104-113.(PENG Fuhua,LI Shulin,LI Xiaoqiang,et al. Deformation monitoring of bulky backfill in No.2 mine area in Jinchuan[J]. Chinese Journal of Rock Mechanics and Engineering,2015,34(1):104-113.(in Chinese))
|
[6] |
于世波,杨小聪,董凯程,等. 空场嗣后充填法充填体对围岩移动控制作用时空规律研究[J]. 采矿与安全工程学报,2014,31(3): 430-434.(YU Shibo,YANG Xiaocong,DONG Kaicheng,et al. Space-time rule of the control action of filling body for the movement of surrounding rock in method of the delayed filling open stoping[J]. Journal of Mining and Safety Engineering,2014,31(3):430-434.(in Chinese))
|
[8] |
中华人民共和国国家标准编写组. GB50771—2012有色金属采矿设计规范[S]. 北京:中国计划出版社,2012.(The National Standards Compilation Group of People?s Republic of China. GB 50771—2012 Code for design of nonferrous metal mining[S]. Beijing:China Planning Press,2012.(in Chinese))
|
[10] |
中华人民共和国行业标准编写组. AQ/T2050.2—2016金属非金属矿山安全标准化规范地下矿山实施指南[S]. 北京:煤炭工业出版社,2016.(The Professional Standards Compilation Group of People?s Republic of China. AQ/T2050.2—2016 The applicable guide of standardized specification of work safety for metal and nonmetal underground mines[S]. Beijing:China Coal Industry Publishing House,2016.(in Chinese))
|
[14] |
原虎军,陈玉明,赵继锋. FAPH在采场安全风险分析中权重分配的应用[J]. 有色金属科学与工程,2010,1(3):55-58.(YUAN Hujun,CHEN Yuming,ZHAO Jifeng. The application of FAHP in priorities of the stope security?s risk analysis[J]. Nonferrous Metals Science and Engineering,2010,1(3):55-58.(in Chinese))
|
[1] |
江飞飞,李向东,万 兵,等. 盘区二步骤采场嗣后胶结充填对岩层移动影响分析[J]. 矿业研究与开发,2016,36(10):94-98.(JIANG Feifei,LI Xiangdong,WAN Bing,et al. Influence analysis of strata movement in subsequent cemented filling of panel second-step stopes[J]. Mining Research and Development,2016,36(10):94-98.(in Chinese))
|
[2] |
赵海军,马凤山,李国庆,等. 充填法开采引起地表移动、变形和破坏的过程分析与机理研究[J]. 岩土工程学报,2008,30(5):670-676.(ZHAO Haijun,MA Fengshan,LI Guoqing,et al. Analysis and mechanism of ground movement,deformation and fracture induced by underground backfill mining[J]. Chinese Journal of Geotechnical Engineering,2008,30(5):670-676.(in Chinese))
|
[5] |
YANG Z,ZHAI S,GAO Q,et al. Stability analysis of large-scale stope using stage subsequent filling mining method in Sijiaying iron mine[J]. Journal of Rock Mechanics and Geotechnical Engineering,2015,7(1):87-94.
|
[7] |
SHESHPARI M. A review of underground mine backfilling methods with emphasis on cemented paste backfill[J]. Electronic Journal of Geotechnical Engineering,2015,20(13):5 183-5 208.
|
[9] |
中华人民共和国国家标准编写组. GB16423—2006金属非金属矿山安全规程[S]. 北京:中国标准出版社,2006.(The National Standards Compilation Group of People?s Republic of China. GB16423—2006 Safety regulations for metal aud nonmetal mines[S]. Beijing:Standards Press of China,2006.(in Chinese))
|
[11] |
李 铀,白世伟,杨春和,等. 矿山覆岩移动特征与安全开采深度[J]. 岩土力学,2005,26(1):27-32.(LI You,BAI Shiwei,YANG Chunhe,et al. Characters of overburden strata movement of mines and safe mining depth[J]. Rock and Soil Mechanics,2005,26(1):27-32.(in Chinese))
|
[12] |
NAGHADEHI M Z,MIKAEIL R,ATAEI M. The application of fuzzy analytic hierarchy process(FAHP) approach to selection of optimum underground mining method for Jajarm Bauxite Mine,Iran[J]. Expert Systems with Applications,2009,36(4):8 218-8 226.
|
[16] |
范 英,李 辰,晋民杰,等. 三角模糊数和层次分析法在风险评价中的应用研究[J]. 中国安全科学学报,2014,24(7):70-74.(FAN Ying,LI Chen,JIN Minjie,et al. Research on application of triangular fuzzy number and AHP in risk evaluation[J]. China Safety Science Journal,2014,24(7):70-74.(in Chinese))
|
[18] |
龚 剑,胡乃联,崔 翔,等. 基于AHP-TOPSIS评判模型的岩爆倾向性预测[J]. 岩石力学与工程学报,2014,33(7):1 442-1 448. (GONG Jian,HU Nailian,CUI Xiang,et al. Rockburst tendency prediction based on AHP-TOPSIS evaluation model[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(7):1 442- 1 448.(in Chinese))
|
[20] |
蔡美峰,何满潮,刘东燕. 岩石力学与工程[M]. 2版. 北京:科学出版社,2013:125-134.(CAI Meifeng,HE Manchao,LIU Dongyan. Rock mechanics and engi-neering[M]. 2nd ed. Beijing:Science Press,2013:125-134.(in Chinese))
|