[2] |
南建民. 木寨岭隧道7#斜井试验段信息化施工[J]. 隧道建设,2011,31(1):88-90.(NAN Jianmin. Information-aided construction of trial section in No.7 inclined shaft of Muzhailing tunnel[J]. Tunnel Construction,2011,31(1):88-90.(in Chinese))
|
[4] |
詹 平. 深部软岩巷道巷帮长锚杆支护技术[J]. 煤炭与化工,2015,38(8):63-66.(ZHAN Ping. Deep and soft rock roadway sides long anchor bolt support technology[J]. Coal and Chemical Industry,2015,38(8):63-66.(in Chinese))
|
[5] |
GUO Z B,GUO P Y,HUANG M H,et al. Stability control of gate groups in deep wells[J]. Mining Science and Technology,2010,22(2):254-259.
|
[7] |
张祉道. 家竹箐隧道施工中支护大变形的整治[J]. 世界隧道,1997,(1):7-16.(ZHANG Zhidao. Treatment of large deformation of supporting in Jiazhuqing tunnel construction[J]. Modern Tunnelling Technology,1997,(1):7-16.(in Chinese))
|
[10] |
INDRARATNA B,KAISER P K. Analytical model for the design of grouted rock bolt[J]. International Journal for Numerical and Analytical Methods in Geomechanics,1990,14(4):227-251.
|
[12] |
谷拴成,周 攀,黄荣宾. 锚杆-围岩承载结构支护下隧洞稳定性分析[J]. 岩土力学,2018,39(增1):122-130.(GU Shuancheng,ZHOU Pan,HUANG Rongbin,et al. Stability analysis of tunnel supported by bolt-surrounding rock bearing structure[J]. Rock and Soil Mechanics,2018,39(Supp.1):122-130.(in Chinese))
|
[14] |
文竞舟,张永兴,王 成. 隧道围岩全长黏结式锚杆界面力学模型研究[J]. 岩土力学,2013,34(6):1 645-1 651.(WEN Jingzhou,ZHANG Yongxing,WANG Cheng. Study of mechanical model of fully grouted rock bolt’s anchorage interface in tunnel surrounding rock[J]. Rock and Soil Mechanics,2013,34(6):1 645-1 651.(in Chinese))
|
[15] |
麦倜曾,张玉军. 锚固岩体力学性质的研究[J]. 工程力学,1987,(1):106-116.(MAI Tizeng,ZHANG Yujun. Research of the bolted rocks statical behavior[J]. Engineering Mechanics,1987,(1):106-116.(in Chinese))
|
[17] |
夏才初,徐 晨,刘宇鹏,等. 基于GZZ强度准则考虑应变软化特性的深埋隧道弹塑性解[J]. 岩石力学与工程学报,2018,37(11):2 468-2 477.(XIA Caichu,XU Chen,LIU Yupeng,et al. Elastoplastic solution of deep buried tunnel considering strain-softening characteristics based on GZZ strength criterion[J]. Chinese Journal of Rock Mechanics and Engineering,2018,37(11):2 468-2 477.(in Chinese))
|
[6] |
赵 勇. 隧道软弱围岩变形机制与控制技术研究[博士学位论文][D]. 北京:北京交通大学,2012.(ZHAO Yong. Study on deformation mechanism and control technology of weak rock surrounding tunnel[Ph. D. Thesis][D]. Beijing:Beijing Jiaotong University,2012.(in Chinese))
|
[16] |
姚显春,李 宁,陈蕴生. 隧洞中全长黏结式锚杆的受力分析[J].岩石力学与工程学报,2005,24(13):2 272-2 276.(YAO Xianchun,LI Ning,CHEN Yunsheng. Theoretical solution for shear stresses on interface of fully grouted bolt in tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(13):2 272-2 276.(in Chinese))
|
[8] |
胡文清,郑颖人,钟昌云. 木寨岭隧道软弱围岩段施工方法及数值分析[J]. 地下空间,2004,(2):194-197.(HU Wenqing,ZHENG Yingren,ZHONG Changyun. Construction method and numerical analysis of soft surrounding rock section of Muzhailing tunnel[J]. Chinese Journal of Underground Space and Engineering,2004,(2):194-197.(in Chinese))
|
[18] |
王立川,侯国强,刘志强,等. 茂县隧道挤压性变形段锚杆作用效果分析[J]. 铁道科学与工程学报,2019,16(4):1 016-1 025. (WANG Lichuan,HOU Guoqiang,LIU Zhiqiang,et al. Analysis on the effects of anchor bolt in squeezing deformation section of Maoxian tunnel[J]. Journal of Railway Science and Engineering,2019,16(4):1 016-1 025.(in Chinese))
|
[20] |
HOEK E,CARRANZA-TORRES C,CORKUM B. Hoek-Brown failure criterion—2002 edition[C]// Proceedings of the North American Rock Mechanics Society NARMS-TAC 2002. HAMMAH R,BAWDEN W F,CURRAN J,et al. ed. Toronto:University of Toronto Press,2002:267-273.
|
[22] |
渠时勤,张 扬,贾瑞华,等. 锚杆黏结力分布和灌浆体剪移刚度的研究[J]. 重庆交通学院学报,2004,23(增1):54-58.(QU Shiqin,ZHANG Yang,JIA Ruihua,et al. Bond strength distribution of the fully grouted cable bolts and grout¢s shearing stiffness[J]. Journal of Chongqing Jiaotong University,2004,23(Supp.1):54-58.(in Chinese))
|
[3] |
谢文兵,杨 超,钱 勋,等. 软岩巷道中锚杆支护失效的机制[J]. 矿山压力与顶板管理,1999,(2):12-13.(XIE Wenbing,YANG Chao,QIAN Xun,et al. Failure mechanism of bolt support in soft rock roadway[J]. Journal of Mining and Safety Engineering,1999,(2):12-13.(in Chinese))
|
[13] |
FREEMAN T J. The behavior of fully-bonded rock bolts in the kielder experimental tunnel[J]. Tunnels and Tunneling,1978,(6):37-40.
|
[1] |
司贤超. 共和隧道特殊围岩段初期支护大变形处理技术[J]. 隧道建设,2010,30(增1):400-405.(SI Xianchao. Treatment of huge deformation of primary reinforcement structure of Gonghe tunnel in special ground[J]. Tunnel Construction,2010,30(Supp.1):400-405.(in Chinese))
|
[9] |
李廷春. 毛羽山隧道高地应力软岩大变形施工控制技术[J]. 现代隧道技术,2011,48(2):59-67.(LI Tingchun. Large deformation control technology for Maoyushan tunnel in soft rock under high in-situ stresses[J]. Modern Tunnelling Technology,2011,48(2):59-67.(in Chinese))
|
[11] |
晏 勤,李树忱,谢 璨,等. 锚杆加固作用下圆形隧道复合岩体围岩特征曲线解析方法研究[J]. 岩石力学与工程学报,2017,36(12):3 021-3 027.(YAN Qin,LI Shuchen,XIE Can,et al. Analytical solution for ground characteristic curve of composite rock mass reinforced by bolts in circular tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2017,36(12):3 021-3 027.(in Chinese))
|
[19] |
张和平,张 喆. 自进式锚杆在陕西某高速公路隧道的应用与效果分析[J]. 公路交通科技:应用技术版,2014,10(7):236-237. (ZHANG Heping,ZHANG Zhe. Application and effect analysis of self-propelled bolt in a highway tunnel in Shaanxi province[J]. Highway Transportation Technology:Applied Technology,2014,10(7):236-237.(in Chinese))
|
[21] |
夏才初,刘宇鹏,吴福宝,等. 基于西原模型的圆形隧道黏弹-黏塑性解析解[J]. 岩土力学,2019,40(5):1 638-1 648.(XIA Caichu,LIU Yupeng,WU Fubao,et al. Viscoelasto-viscoplastic solutions for circular tunnel based on Nishihara model[J]. Rock and Soil Mechanics,2019,40(5):1 638-1 648.(in Chinese))
|