(1. Engineering Research Center of Rock-soil and Excavation and Protection of Ministry of Education,China University of Geosciences,Wuhan,Hubei 430074,China;2. Faculty of Engineering,China University of Geosciences,Wuhan,Hubei 430074,China;3. College of Architecture and Civil Engineering,Xi'an University of Science and Technology,Xi'an,Shaanxi 710054,China;4. HydroChina Chengdu Engineering Corporation,Chengdu,Sichuan 610072,China)
Abstract:On the basis of combining with the relevant industry standards and considering the factors of engineering importance and hazards stability,hazard rating assessment system(HRAS) of surrounding slope,which has enough easily valued indicators,is established according to 3 first level indices (the hazard source,path and inducing factors);9 secondary indices(stability,potential energy,hazard sources shape,paths geometric features,vegetation growth,earthquake and rainfall) and 35 basic indices. According to the level of values ,hazards rating is divided into 3 levels—high,medium,low level. Taking the surrounding slope of ground powerhouse as an example,there are 12 hazard sources of 3 high hazard rating and 9 medium. The result is largely correspondence to reality. and the system can correctly evaluate the risk degree and make guidance for dangerous source prevention and controlling.
宋胜武,冯学敏,向柏宇,等. 西南水电高陡岩石边坡工程关键技术研究[J]. 岩石力学与工程学报,2011,30(1):1-22.(SONG Shengwu,FENG Xuemin,XIANG Boyu,et al. Research on key technologies on high and steep rock slopes of hydropower engineering in Southwest China[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(1):1-22.(in Chinese))
[2]
袁国庆,檀瑞青,张明森,等. 双江口水电站环境边坡孤石及危岩体发育特征与防治措施[J]. 四川地质学报,2011,(4):435-437.(YUAN Guoqing,TAN Ruiqing,ZHANG Mingsen,et al. Study of slope stability of the Shuangjiangkou hydropower station[J]. ActaGeologicaSichuan,2011,(4):435-437.(in Chinese))
[3]
黄达,黄润秋,周江平,等. 雅砻江锦屏一级水电站坝区右岸高位边坡危岩体稳定性研究[J]. 岩石力学与工程学报,2007,26(1):175-181.(HUANG Da,HUANG Runqiu,ZHOU Jiangping,et al. Study on stability evaluation of unstable rock masses on right bank high altitude slope in the first stage Jinping hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(1):175-181.(in Chinese))
[4]
胡卸文. 水利水电工程建设用地地质灾害危险性评估中的若干技术问题探讨[J]. 水文地质工程地质,2007,34(1):126-128.(HU Xiewen. Technical issues on geological hazard assessment of water sources and hydropower engineering[J]. Hydrogeology and EngineeringGeology,2007,34(1):126-128.(in Chinese))
[5]
张世殊,徐光黎,宋胜武,等. 水电工程环境边坡地震动破坏模式分析[J]. 四川大学学报:工程科学版,2011,43(增2):33-38.(ZHANG Shishu,XU Guangli,SONG Shengwu,et al. Seismic failure modes of surrounding slope for hydropower engineering[J]. Journal of Sichuan University:Engineering Science,2011,43(Supp.2):33-38.(in Chinese))
[6]
宋胜武,徐光黎,张世殊. 论水电工程边坡分类[J]. 工程地质学报,2012,20(1):123-130.(SONG Shengwu,XU Guangli,ZHANG Shishu. On slope classification for hydropower engineering[J]. Journal of Engineering Geology,2012,20(1):123-130.(in Chinese))
[7]
吉锋,邓忠文. 水电工程环境边坡危险源危险性评价体系初步研究[J]. 长江科学院院报,2011,28(7):24-27.(JI Feng,DENG Zhongwen. Risk assessment of systemof environmental slope hazard at hydropower project[J]. Journal of Yangtze River Scientific Research Institute,2011,28(7):24-27.(in Chinese))
[8]
PIERSON LA,VAN VICKLE R. Rockfall hazard rating system-participant’s manual[R]. Phoenix:SNI International Resources Inc.,1993.
[9]
SINGH A. FRHI—a systemto evaluate and mitigate rockfall hazard in stable rock excavations[J]. Journal of the Institution of Engineers,2004,85(1):62-75.
[10]
KOLEINI M. Falling rock hazard index:a case study from the Marun dam and power plant,South-western Iran[J]. Bulletin of Engineering Geology and the Environment,2011,70(2):279-290:1-9.
[11]
YOUSSEF A,MAERZ N. Development,justification,and verification of a rock fall hazard rating system[J]. Bulletin of Engineering Geology and the Environment,2012,71(1):171-186.
[12]
日本道路協.落石対策便覧[M]. 東京:日本道路協会,2000:1-91.
[13]
国土资源部.地质灾害危险性评估技术要求(试行)[S]. 北京:[s. n.],2004.(Ministry of Land andResources. Technicalrequirements forgeologicalhazard assessment(trial)[S]. Beijing:[s. n.],2004.(in Chinese))
[14]
董家兴,徐光黎,申艳军,等. 卜寺沟水电站环境边坡危险源分类及危险度评价[J]. 工程地质学报,2012,20(5):760-767.(DONG Jiaxing,XU Guangli,SHEN Yanjun,et al. Classification and risk rating assessment of hazard sources in surrounding slope of Busigou hydropower project[J]. Journal of Engineering Geology,2012,20(5):760-767.(in Chinese))