Abstract:The lock chamber was made of permanent steel plate pile and the prestressed anchor cable was adopted in structure. The structure was firstly applied to the shiplock engineering in China. Because the site soil is inhomogenous and the geologic conditions are complicated and highly changeable,the dispersed and compressed earth anchor cable was accepted in this project to meet the requirement of design load and construction quality. The measurement was made during the proceed of construction,and some successful experiences were obtained.
燕立群1 朱轶群1 易著伟2. 分散压缩型土锚在较复杂土质中的应用[J]. 岩石力学与工程学报, 2002, 21(S): 2230-2233.
Yan Liqun1, Zhu Yiqun1, Yi Zhuwei2. APPLICATION OF THE DISPERSED AND COMPRESSED EARTH ANCHOR SYSTEM TO THE SOIL WITH COMPLICATED PROPERTIES. , 2002, 21(S): 2230-2233.