| NUMERICAL ANALYSIS AND APPLICATION OF LARGE DIAMETER CAVITY PARALLEL CUT BLASTING STRESS FIELD IN VERTICAL SHAFT |
| WANG Haibo,ZONG Qi,ZHAO Yaocai |
| (School of Civil Engineering and Architecture,Anhui University of Science and Technology,Huainan,Anhui 232001,China) |
|
|
|
|
Abstract For improve drilling and blasting excavation efficiency of vertical shaft hard rock section,design a large diameter cavity in center of same deep of two section parallel cut blasting. According to theoretical calculation and practical experience choose cut blasting parameters,circle diameter of the first section cut hole is 1 700 mm and it?s hole space is 850 mm,the second section cut hole circle diameter is 2 500 mm with hole space 650 mm. Finite element software LS-DYNA is used for blasting stress field of first section cut blasting numerical simulation analysis and blasting parameters rationality verification. The numerical simulation results show that large diameter cavity in center can improve stress peak value and extend action time,stress wave of rock around large diameter cavity is 2.2 times than the value of rock without cavity. At the same time,numerical simulation show stress wave superposition and reflection,guiding phenomena during large diameter cavity of parallel cut. Then deep-hole blasting field research for vertical shaft hard rock section is done,obtained good effect of average utilization rate 91.7%,lumpiness uniform in rock stability coefficient f = 12–17.
|
|
|
|
|
|
| [1] 宗 琦,傅菊根,徐华生. 立井冻土掘进爆破技术的研究与应用[J]. 岩土力学,2007,28(9):1 992–1 996.(ZONG Qi,FU Jugeng,XU Huasheng. Study and application of frozen soil blasting technique in shaft[J]. Rock and Soil Mechanics,2007,28(9):1 992–1 996.(in Chinese))
[2] 史建华,宋文鹏. 郭屯煤矿主井井筒深厚冻结基岩段安全施工技术[J]. 煤炭技术,2007,26(2):92–93.(SHI Jianhua,SONG Wenpeng. Safe construction technology for freezing bedrock section in main shaft of Guotun Coal Mine[J]. Coal Technology,2007,26(2):92–93.(in Chinese))
[3] 韩 博,张乃宏. 立井井筒基岩段深孔爆破技术参数优化分析[J]. 煤炭工程,2012,(3):29–31.(HAN Bo,ZHANG Naihong. Analysis on parameter optimization of blasting technology for deep borehole in base rock section of mine shaft[J]. Coal Engineering,2012,(3):29–31.(in Chinese))
[4] 管继雷,王文辉. 双联伞形钻架在大断面立井冻结基岩段掘进中的应用[J]. 建井技术,2013,34(4):24–28.(GUAN Jilei,WANG Wenhui. Dual rigs applied to large cross freezing base rock section construction of mine shaft[J]. Mine Construction Technology,2013,34(4):24–28.(in Chinese))
[5] 徐 颖,宗 琦. 地下工程爆破理论及应用[M]. 徐州:中国矿业大学出版社,2001:184–186.(XU Ying,ZONG Qi. Theory and application of underground blasting [M]. Xuzhou:China University of Mining and Technology Press,2001:184–186.(in Chinese))
[6] LANGERFORS U,KIHLSTORM B. The modern technique of rock blasting[M]. New York:John Willey and Sobs Co.,1963:25–32.
[7] 刘优平,黎剑华,林大能,等. 掏槽爆破中空孔效应的理论与试验研究[J]. 矿业研究与开发,2007,27(5):75–77.(LIU Youping,LI Jianhua,LIN Daneng,et al. Theoretical and experimental study on effects of empty hole in cut blasting[J]. Mining Research and Development,2007,27(5):75–77.(in Chinese))
[8] 杨善元,刘殿书. 直眼掏槽中空孔作用的试验研究[C]// 工程爆破文集第三辑. 徐州:中国矿业大学出版社,1988:56–62.(YANG Shanyuan,LIU Dianshu. Trials on effect of empty hole in blasting cut[C]// Proceedings of the Blasting Engineering,Xuzhou:China University of Mining and Technology press,1988:56–62.(in Chinese)
[9] 林大能,陈寿如. 空孔直眼掏槽成腔模型理论与实践分析[J]. 岩土力学,2005,26(3):479–483.(LIN Daneng,CHEN Shouru. Experimental and theoretical study of parallel hole cut blasting with cavity[J]. Rock and Soil Mechanic,2005,26(3):479–483.(in Chinese)
[10] 张 奇,杨永琦,金乾坤,等. 直眼掏槽爆破机理若干基本问题的研究[J]. 煤炭学报,1997,22(3):284–287.(ZHANG Qi,YANG Yongqi,JIN Qiankun,et al. Study of some aspects of mechanism in straight cut blasting[J]. Journal of China Coal Society,1997,22(3):284–287.(in Chinese)
[11] 张 奇,杨永琦,员永峰,等. 直眼掏槽爆破效果的影响因素分析[J]. 岩土力学,2001,22(2):144–150.(ZHANG Qi,YANG Yongqi,YUAN Yongfeng,et al. Study on the factors affecting parallel hole cut blasting[J]. Rock and Soil Mechanics,2001,22 (2):144–150.(in Chinese)
[12] WANG Z L,KONIETZDY H. Modeling of blast- induced fractures in jointed rock masses[J]. Engineering Fracture Mechanics,2009,76(12):1 945–1 955.
[13] 郑祥滨,璩世杰,范利华,等. 单螺旋空孔直眼掏槽成腔过程数值模拟研究[J]. 岩土力学,2008,29(9):2 589–2 594.(ZHENG Xiangbin,QIU Shijie,FAN Lihua,et al. Numerical simulation of cavity formation process by single helix parallel hole cut blasting[J]. Rock and Soil Mechanics,2008,29(9):2 589–2 594.(in Chinese))
[14] 李启月,徐 敏,范作鹏,等. 直眼掏槽破岩过程模拟与空孔效应分析[J]. 爆破,2011,28(4):23–26.(LI Qiyue,XU Min,FAN Zuopeng,et al. Simulation of rock failure process in cutting by parallel hole and analysis on empty hole effect[J]. Blasting,2011,28(4):23– 26.(in Chinese)
[15] 魏 炯,朱万成,魏晨慧,等. 导向孔对两爆破孔间成缝过程影响的数值模拟[J]. 工程力学,2013,30(5):335–339.(WEI Jiong,ZHU Wancheng,WEI Chenhui,et al. Numerical simulation on contribution of guide-hole to crack coalescence of two boreholes[J]. Engineering Mechanics,2013,30(5):335–339.(in Chinese))
[16] 林英松,葛洪魁,王顺昌. 岩石动静力学参数的试验研究[J]. 岩石力学与工程学报,1998,17(2):216–222.(LIN Yingsong,GE Hongkui,WANG Shunchang. Testing study on dynamic and static elastic parameters of rocks[J]. Chinese Journal of Rock Mechanics and Engineering,1998,17(2):216–222.(in Chinese))
[17] 宗 琦,涂耀辉. 立井深孔爆破的若干技术问题[J]. 矿冶工程,2002,22(2):20–23.(ZONG Qi,TU Yaohui. Some techniques of deep blasting in rock shaft[J]. Mining and Metallurgical Engineering,2002,22(2):20–23.(in Chinese)
[18] 赵国彦,赵井清,李启月. 9孔桶形掏槽一次成井技术[J]. 科技导报,2013,31(16):21–25.(ZHAO Guoyan,ZHAO Jingqing,LI Qiyue. Nine-hole parallel cutting technology of the shaft excavation in one-step[J]. Science and Technology Review,2013,31(16):21–25.(in Chinese) |
|
|
|