| [1] |
叶圣教. 辛普伦铁路隧道的施工和回顾[M].成都:西南交通大学出版社,1995:120-134.(YE Shengjiao. Review of Simplon railway tunnel construction[M].Chengdu:Southwest Jiaotong University Press,1995:120-134.(in Chinese))
|
| [2] |
BARLA G.Squeezing rocks in tunnels[J].ISRM News Journal,1995,3(4):44-49.
|
| [3] |
SINGH B,GOEL R K,JETHWA J L,et al. Support pressure assessment in arched underground openings through poor rock masses[J]. EngineeringGeology,1997,48(1/2):59-81.
|
| [4] |
喻渝.挤压性围岩支护大变形的机制及判定方法[J].世界隧道,1998,(1):46-51.(YU Yu. Serious deformation of surrounding rock insqueezing ground[J].WorldTunnel,1998,(1):46-51.(in Chinese))
|
| [5] |
孙元春,张巍.挤压性隧道围岩变形分级研究综述[J].现代隧道技术,2011,48(增):42-47.(SUN Yuanchun,ZHANG Wei.Review on classification method of squeezing deformation in tunnels[J].ModernTunnelling Technology,2011,48(Supp.):42-47.(in Chinese))
|
| [6] |
关宝树.隧道施工要点集[M].北京:人民交通出版社,2003:389-403.(GUAN Baoshu. Key points set of tunnel construction[M].Beijing:China Communications Press,2003:389-403.(in Chinese))
|
| [7] |
刘高,张帆宇,李新召,等.木寨岭隧道大变形特征及机制分析[J].岩石力学与工程学报,2005,24(Supp.2):5521-5526.(LIU Gao,ZHANG Fanyu,LIU Xinzhao,et al.Research on large deformation and its mechanism of Muzhailing tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(Supp.2):5521-5526.(in Chinese))
|
| [8] |
刘志春,朱永全,李文江,等.挤压性围岩隧道大变形机制及分级标准研究[J].岩土工程学报,2008,30(5):690-697.(LIU Zhichun,ZHU Yongquan,LI Wenjiang,et al.Mechanism and classification criterion for large deformation of squeezing ground tunnels[J].Chinese Journal of Geotechnical Engineering,2008,30(5):690-697.(in Chinese))
|
| [9] |
孙元春. 挤压性围岩变形机制及其控制技术研究[博士学位论文][D].北京:中国科学院地质与地球物理研究所,2010.(SUN Yuanchun.Research on mechanism and controlling technologies of surrounding rock in sqeezing ground[Ph. D. Thesis][D]. Beijing:Institute of Geology and Geophysics,Chinese Academey of Sciences,2010.(in Chinese))
|
| [10] |
林达明,尚彦军,陈明星,等.雁门关隧道大变形突泥段地质结构与力学分析[J].岩石力学与工程学报,2012,31(增1):2751-2757.(LIN Daming,SHANG Yanjun,CHEN Mingxing,et al.Geological structures and mechanical analysis of large-deformation mud bursting section in Yanmengguan tunnel[J].Chinese Journal of Rock Mechanicsand Engineering,2012,31(Supp.1):2751-2757.(in Chinese))
|
| [11] |
铁道第三勘察设计院集团有限公司.雁门关隧道工程地质勘察报告[R].天津:铁道第三勘察设计院集团有限公司,2007.(The3rd Railway Survey and Design Institute Group Corporation. Reporton engineeringgeological investigation of Yanmenguan tunnel[R].Tianjin:The 3rd Railway Survey and Design Institute GroupCorporation,2007.(in Chinese))
|
| [12] |
孙元春,高波,许再良,等.隧道围岩挤压变形预测方法研究[J].铁道工程学报,2012,161(2):50-54.(SUN Yuanchun,GAO Bo,XU Zailiang,et al.Research on prediction method of squeezing deformation of surrounding rock oftunneling[J].Journal of Railway EngineeringSociety,2012,161(2):50-54.(in Chinese))
|
| [13] |
中华人民共和国铁道部.高速铁路隧道工程施工技术指南[M].北京:中国铁道出版社,2010:47-50.(Ministry of Railways of the P.R.C.Technical guide for construction of high-speed railway tunnel engineering[M].Beijing:China Railway Publishing House,2010:47-50.(in Chinese))
|
| [14] |
吕庆,孙红月,尚岳全.强度折减有限元法中边坡失稳判据的研究[J].浙江大学学报:工学版,2008,42(1):83-87.(LU Qing,SUNHongyue,SHANG Yuequan.Slope failure criteria of shear strengthreduction finite element method[J].Journal of Zhejiang University:Engineering Science,2008,42(1):83-87.(in Chinese))
|