Citation Search Quick Search
  2016, Vol. 35 Issue (S1): 3394-3401    DOI: 10.13722/j.cnki.jrme.2015.1401
Artiles Current Issue | Archive | Adv Search |
Unloading model test and numerical simulation analysis on high fill loess open cut tunnel with EPS
LI Sheng1,LI Shanzhen1,WANG Qicai1,MA Li2,WANG Qingshi1,XU Wenqi1
(1. College of Civil Engineering,Lanzhou Jiaotong University,Lanzhou,Gansu 730070,China;2. College of Civil Engineering,Lanzhou Institute of Technology,Lanzhou,Gansu 730050,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号