| [1] |
许 强.四川省“8·13”特大泥石流灾害特点、成因与启示[J]. 工程地质学报,2010,18(5):596-608.(XUQiang. The13August2010catastrophic debris flows in Sichuan Province:characteristics,genetic mechanism and suggestions[J].Journal ofEngineeringGeology,2010,18(5):596-608.(in Chinese))
|
| [2] |
唐 川,李为乐,丁 军,等. 汶川震区映秀镇“8·14”特大泥石流灾害调查研究[J]. 地球科学——中国地质大学学报,2011,36(1):172-180.(TANGChuan,LI Weile,DING Jun,et al.Field investigation and research on giant debris flow on August 14,2010 in Yingxiu Town,epicenter of Wenchuan earthquake[J].Earth Science—Journal of China University of Geosciences,2011,36(1):172-180.(in Chinese))
|
| [3] |
曾 超,崔 鹏,葛永刚,等. 四川汶川七盘沟“7·11”泥石流破坏建筑物的特征与力学模型[J]. 地球科学与环境学报,2014,36(2):81-91.(ZENGChao,CUIPeng,GEYonggang,et al.characteristics and mechanism of buildings damaged by debris flowson 11 July,2013 in Qipangou of Wenchuan,Sichuan[J].Journal of Earth Sciences and Environment,2014,36(2):81-91.(in Chinese))
|
| [4] |
向国萍,张丹丹,常 鸣,等.七盘沟堰塞体溃决后水动力特征及沟内泥石流启动条件分析[J]. 水电能源科学,2015,33(4):143-146.(XIANGGuoping,ZHANG Dandan,CHANGMing,et al. Hydrodynamics and debris flow-triggering conditions after dam break in Qipangou Gully[J].Resources and Power,2015,33(4):143-146.(in Chinese))
|
| [5] |
NI H,LIU Y K. Transitional flow in channel junctions[J]. Journal of Hydrodynamics(Ser.B),2004,16(4):464-467.
|
| [6] |
陈春光,姚令侃. 泥石流与主河交汇区三维数值模拟[J]. 重庆交通学院学报,2006,25(2):61-65.(CHEN Chunguang,YAO Lingkan. Three dimensional numerical simulation of confluence ofdebris flow and main river[J].Journal of Chongqing Jiaotong University,2006,25(2):61-65.(in Chinese))
|
| [7] |
陈春光,姚令侃,杨庆华. 泥石流与主河水流交汇的试验研究[J]. 重庆交通学院学报,2004,39(1):10-14.(CHENChunguang,YAO Lingkan,YANG Qinghua. Experimental research on confluence between debris flow and main river debris flow and main river[J].Journal of SouthwestJiaotong University,2004,39(1):10-14.(in Chinese))
|
| [8] |
黄翔超. 汶川震区典型泥石流堵江可能性分析[硕士学位论文][D]. 成都:成都理工大学,2012.(HUANGXiangchao. Thepossibility of blocking river of typical debris flow in Wenchuan earthquake zone[M. S.Thesis][D]. Chengdu:Chengdu University of Technology,2012.(in Chinese))
|
| [9] |
齐云龙,周 勇,龚成会. 泥石流堵河影响因素及减灾对策[J]. 四川建筑,2012,32(4):147-149.(QIYunlong,ZHOU Yong,GONG Chenghui.The influence factors of blocking river and mitigation counter measures of debris flow[J].Journal of Sichuan Architecture,2012,32(4):147-149.(in Chinese))
|
| [10] |
杜 翠,姚令侃,杨运林,等. 基于动力学与物质条件的泥石流阻塞大河综合判据[J]. 水利学报,2012,43(增2):128-132.(DU Cui,YAO Lingkan,YANG Yunlin,et al. Criteria of debris flow damming of large river in terms of dynamical process and material composition[J].Journal of Hydraulic Engineering,2012,43(Supp.2):128-132.(in Chinese))
|
| [11] |
郭志学,曹叔尤,刘兴年,等. 泥石流堵江影响因素试验研究[J]. 水利学报,2004,35(11):39-45.(GUO Zhixue,CAO Shuyou,LIU Xingnian,et al. Experimental study on parameters affecting the rives blocking due to debris flow[J]. Journal of Hydraulic Engineering,2004,35(11):39-45.(in Chinese))
|
| [12] |
李德华,许向宁,郝红兵. 四川汶川县映秀镇红椿沟“8·14”特大泥石流形成条件与运动特征分析[J]. 中国地质灾害与防治学报,2012,23(3):32-38.(LI Dehua,XU Xianglin,HAO Hongbing. Formationconditions and the movement characteristics of “8·14”giant debris flow in Yingxiu Town,Wenchuan County,Sichuan Province[J].the Chinese Journal of Geological Hazard and Control,2012,23(3):32-38.(in Chinese))
|
| [13] |
倪化勇,唐 川. 中国泥石流起动物理模拟试验研究进展[J]. 水科学进展,2014,25(4):606-613.(NIH Y,TANGChuan. Advances inthe physical simulation experiment on debris flow initiation in China[J].Advances in Water Science,2014,25(4):606-613.(in Chinese))
|
| [14] |
何其多. 大型泥石流汇江诱发灾害链的初步研究[硕士学位论文][D]. 成都:西南石油大学,2014.(HE Qiduo. Disaster chain inducedDebris Flow¢Converging into River[M. S. Thesis][D]. Chengdu:Southwest Petroleum University,2014.(in Chinese))
|