| [1] |
LIN P,ZHOU W Y,LIU H Y. Experimental study on cracking,reinforcement,and overall stability of the Xiaowan super-high arch dam[J]. Rock Mechanics and Rock Engineering,2015,48(2):819-841.
|
| [2] |
中国电建成都勘测设计研究院有限公司. 雅砻江二滩水电站拱坝33#/34#坝段裂缝分析研究[R]. 成都:中国电建成都勘测设计研究院有限公司,2004.(PowerChina Kunming Engineering Corporation Limited. Study on cracking in dam sections #33/#34 of Ertan arch dam[R]. Chengdu:PowerChina Kunming Engineering Corporation Limited,2004.(in Chinese))
|
| [3] |
BAUSTAEDTER K,WIDMANN R. The Behavior of the Kolnbrein Arch Dam[C]// Proceeding of the 15th International Commission on Large Dams. Lausanne:[s.n.],1985:633-651.
|
| [4] |
LONDE P. The malpasset dam failure[J]. Engineering Geology,1987,24(1/4):331-338.
|
| [5] |
周维垣,林鹏,杨若琼,等. 高拱坝地质力学模型试验方法与应用[M]. 北京:中国水利水电出版社,2008:118-188.(ZHOU Weiyuan,LIN Peng,YANG Ruoqiong,et al. Method and applicationof geomechanics model test on high arch dam[M]. Beijing:China Water and Power Press,2008:118-188.(in Chinese))
|
| [6] |
LIN P,MA T H,LIANG Z Z,et al. Failure and overall stability analysis on high arch dam based on DFPA code[J]. Engineering Failure Analysis,2014,45(1):164-184.
|
| [7] |
陈卫忠,朱维申,邱祥波,等. 小湾水电站拱坝坝肩岩体加固方案分析研究[J]. 岩石力学与工程学报,2002,21(3):374-378.(CHEN Weizhong,ZHU Weishen,QIU Xiangbo,et al. Research on reinforcement scheme for xiaowan abutment[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(3):374-378.(in Chinese))
|
| [8] |
宁宇,徐卫亚,郑文棠,等. 白鹤滩水电站拱坝及坝肩加固效果分析及整体安全度评价[J]. 岩石力学与工程学报,2008,27(9):1890-1898.(NING Yu,XU Weiya,ZHENG Wentang,et al. Reinforcement effect analysis and global safety evaluation of arch dam and abutment ofBaihetan hydropower station[J]. Chinese Journal of Rock Mechanicsand Engineering,2008,27(9):1890-1898.(in Chinese))
|
| [9] |
张冲,侯艳丽,金峰,等. 拱坝-坝肩三维可变形离散元整体稳定分析[J]. 岩石力学与工程学报,2006,25(6):1226-1232.(ZHANG Chong,HOU Yanli,JIN Feng,et al. Analysis of arch dam-abutmentstability by 3D deformable distinct elements[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(6):1226-1232.(in Chinese))
|
| [10] |
武清玺,杨明珠,韩宪军. 用非连续介质模型分析拱坝坝肩的动力稳定性[J]. 岩石力学与工程学报,2007,26(增2):4232-4237.(WU Qingxi,YANG Mingzhu,HAN Xianjun. Dynamic stability analysis of arch dam abutment with discontinuous media model[J]. Chinese Journalof Rock Mechanics and Engineering,2007,26(Supp.2):4232-4237.(in Chinese))
|
| [11] |
长江勘测规划设计研究有限责任公司. 金沙江乌东德水电站坝肩高程850m以上地质缺陷处理专题设计报告[R]. 武汉:长江勘测规划设计研究有限责任公司,2016.(The Yangtze River Institute of Survey,Planning,Design and Research. Geological defects design report of Wudongde hydroelectric project[R]. Wuhan:The Yangtze River Institute of Survey,Planning,Design and Research,2016.(in Chinese))
|
| [12] |
林鹏,王仁坤,康绳祖,等. 特高拱坝基础破坏、加固与稳定关键问题研究[J]. 岩石力学与工程学报,2011,30(10):1945-1958.(LIN Peng,WANG Renkun,KANG Shengzu,et al. Key problems of foundation failure,reinforcement and stability for superhigh arch dams[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(10):1945-1958.(in Chinese))
|