[1] |
徐平,茅献彪,张敏霞,等. 采动塌陷区建筑物地基变形影响区与特征分析[J]. 采矿与安全工程学报,2014,31(4):624-630.(XU Ping,MAO Xianbiao,ZHANG Minxia,et al. Analysis of the deformation zone and its characteristics of the building foundations in mining-induced subsidence area[J].Journal of Mining andSafety Engineering,2014,31(4):624-630.(in Chinese))
|
[2] |
YANG D,BIANZ,LEI S. Impact on soil physical qualities by the subsidence of coal mining:a case study in Western China[J]. Environmental Earth Sciences,2016,75(8):10.1007/s12665-12016-15439-12662.
|
[3] |
邓喀中,郭广礼,谭志祥. 采动区建筑物移动变形特性分析[J]. 中国矿业大学学报,2001,30(4):354-358.(DENG Kazhong,GUO Guangli,TAN Zhixiang. Study on the properties of coordination of the base and foundation of the building above mining subsidence area[J]. Journal of China Coal Society,2001,30(4):354-358.(in Chinese))
|
[4] |
朱庆伟,蒋军. 煤层开采沉陷对桥梁建筑物的影响分析[J]. 测绘科学,2014,(4):88-91.(ZHU Qingwei,JIANG Jun. School of surveying science and technology,xi’an university of science and technology[J]. Science of Surveying and Mapping,2014,(4):88-91.(in Chinese))
|
[5] |
张世亮. 高速铁路釆空区路基变形物理模型试验研究[硕士学位论文][D].成都:西南交通大学,2010.(ZHANG Shiliang. Model test of deformation of high-speed railway embankment overlying mined-out area[M. S. Thesis][D]. Chengdu:Southwest Jiaotong University,2010.(in Chinese))
|
[6] |
中华人民共和国行业标准编写组. 客运专线无昨轨道铁路工程测量暂行规定[S]. 北京:中国铁道出版社,2006.(The Professional Standards Compilation Group of People¢s Republic of China. Passenger dedicated line no previous rail railway engineering survey interim provisions[S]. Beijing:China Railway Publishing House,2006.(in Chinese))
|
[7] |
于广云,柏永生. 地下开采对地表及铁路桥影响的数值模拟研究[J]. 地下空间与工程学报,2007,3(8):1579-1582.(YU Guangyun,BAI Yongsheng. Numeric simulation on the effect of Underground extraction on ground surface and railway bridge[J]. Chinese Journal of Underground Space and Engineering,2007,3(8):1579-1582.(in Chinese))
|
[8] |
杨洋,于广云,柏永生,等. 采动对铁路桥和地表土的影响研究[J]. 铁道建筑,2008,(11):57-59.(YU Yang,YU Guangyun,BAI Yongsheng,et al. Study on the influence of mining on railway bridge and surface soil[J]. Railway Engineering,2008,(11):57-59.(in Chinese))
|
[9] |
田书群. 寺沟下覆煤层采动作用下公路桥基变形失稳机理数值模拟分析[J]. 公路工程,2007,32(6):119-122.(TIAN Shuqun.Numerical stimulation and calculation of the foundation of bridge distortion and stability of mechanism with mining of coal bed under the sigou[J].Road Construction,2007,32(6):119-122.(in Chinese))
|
[10] |
王豪. 高速铁路采空区桥基变形监测分析[硕士学位论文][D]. 成都:西南交通大学,2011.(WANG Hao. Deformation monitoring of high speed railway bridge foundation overlying mined-outarea[M. S. Thesis]. Chengdu:Southwest Jiaotong University,2011.(in Chinese))
|
[11] |
谭志祥,杨怀勇,邓喀中. 采动铁路桥移动变形规律实测研究[J]. 采矿与安全工程学报,2007,24(2):243-247.(TAN Zhixiang,YANG Huaiyong,DENG Kazhong. Study on change laws of additional ground reaction force of buildings in mining area[J]. Journal of China Coal Society,2007,24(2):243-247.(in Chinese))
|
[12] |
夏军武,于广云,王侃. 采动区桥体可靠性分析及抗变形技术研究[J]. 煤炭学报,2005,30(1):17-21.(XIA Junwu,YU Guangyun,WANGKan. Analysis of bridge reliability in mining area and study on deformation resistance technology[J]. Journal of China Coal Society,2005,30(1):17-21.(in Chinese))
|
[13] |
于广云,夏军武,王东权. 采动区铁路桥沉陷加固治理[J]. 中国矿业大学学报,2004,33(1):59-61.(YU Guangyun,XIA Junwu,WANG Dongquan. Reinforcement of railway bridge over mining subsidence areas[J].Journal of China University of Mining andTechnology,2004,33(1):59-61.(in Chinese))
|
[14] |
徐平,郭文兵,张敏霞. 控制采动区桥梁移动变形方法研究[J]. 采矿与安全工程学报,2011,28(2):425-429.(XU Ping,GUO Wenbing,ZHANG Minxia. Methods of controlling movement and derformation of mining induced bridge[J]. Journal of China Coal Society,2011,28(2):425-429.(in Chinese))
|
[15] |
邓喀中,郭广礼,谭志祥. 采动区建筑物地基、基础协同作用特性研究[J]. 煤炭学报,2001,26(6):601-605.(DENG Kazhong,GUO Guangli,TAN Zhixiang. Study on the properties of coordination of the base and foundation of the building above mining subsidence area[J]. Journal of China Coal Society,2001,26(6):601-605.(in Chinese))
|
[16] |
郭文兵,雍强. 采动影响下高压线塔与地基、基础协同作用模型研究[J]. 煤炭学报,2011,36(7):1075-1080.(GUO Wenbing,YONG Qiang. Study on the synergy acting model of high voltage power transmission lines tower,groundwork and foundation influenced by mining[J].Journal of China Coal Society,2011,36(7):1075-1080.(in Chinese))
|
[17] |
夏军武,袁迎曙,董正筑. 采动区地基、条形基础与框架结构共同作用机理研究[J]. 岩土工程学报,2007,29(4):537-541.(XIA Junwu,YUAN Yingshu,DONG Zhengzhu.Mechanism study on subsoil-strap footing-framework interaction in mining subsidence area[J]. Chinese Journal of Geotechnical Engineering,2007,29(4):537-541.(in Chinese))
|
[18] |
谭志祥,邓喀中. 采动区建筑物地基、基础和结构协同作用模型[J]. 中国矿业大学学报,2004,33(3):264-267.(TAN Zhixiang,DENG Kazhong. Coordinating work model of ground foundation and structure of building in mining area[J]. Journal of China University of Mining andTechnology,2004,33(3):264-267.(in Chinese))
|
[19] |
XU K J,POULOS H G. 3D elastic analysis of vertical piles subjected to “passive”loadings[J]. Computers and Geotechnics,2001,28(5):349-375.
|
[20] |
CHANG X,LIU D,GAO F,et al.A study on lateral transient vibration of large diameter piles considering pile-soil interaction[J]. Soil Dynamics and Earthquake Engineering,2016,90:211-220.
|
[21] |
TAN S A,FELLENIUS B H. Negative skin friction pile concepts with soil-structure interaction[J]. ICE Geotechnical Research Journal,2016,3(4):137-147.
|
[22] |
梁发云,姚国圣,陈海兵,等. 土体侧移作用下既有轴向受荷桩性状的室内模型试验研究[J]. 岩土工程学报,2010,32(10):1603-1609.(LIANG Fayun,YAO Guosheng,CHEN Haibing,et al. Model tests on behavior of axially loaded piles subjected to lateral soil movement[J]. Chinese Journal of Geotechnical Engineering,2010,32(10):1603-1609.(in Chinese))
|
[23] |
姚国圣,梁发云,李镜培,等. 土体侧移作用下轴向受荷单桩承载性状数值分析[J]. 同济大学学报:自然科学版,2011,39(1):1-6.(YAO Guosheng,LIANG Fayun,LI Jingpei,et al. 3D numerical analysis for behavior of axially loaded pile subjected to lateral soil movement[J]. Journal ofTongji University:Natural Science,2011,39(1):1-6.(in Chinese))
|
[24] |
SULEIMAN M T,NI L,HELM J D,etal.Soil-pile interaction for a small diameter pile embedded in granular soil subjected to passive loading[J]. Journal of Geotechnical and Geoenvironmental Engineering,2014,140(04014002):10.1061/(ASCE)GT.1943-5606.0001081.
|
[25] |
盛平,于广云,李小琴. 采动区表土水平移动对桩基作用的数值模拟研究[J]. 地下空间与工程学报,2009,5(增2):1542-1567.(SHENG Ping,YU Guangyun,LI Xiaoqin. Research on numerical smiulation of pile foundation subjected to topso il lateralmovement inm in ing area[J]. Journal of Underground Space and Engineering,2009,5(Supp.2):1542-1567.(in Chinese))
|
[26] |
何国清,杨伦,凌赓娣. 矿山开采沉陷学[M]. 徐州:中国矿业大学出版社,1991:79-92.(HE Guoqing,YANG Lun,LING Saidi.Mine mining subsidence[M]. Xuzhou:China University of Mining and Technology Press,1991:79-92.(in Chinese))
|
[27] |
刘宝琛,廖国华. 煤矿地表移动的基本规律[M]. 北京:中国工业出版社,1965:38-69.(LIU Baochen,LIAO Guohua.The basic law of surface movement in coal mine[M]. Beijing:China Industry Press,196:38-69.(in Chinese))
|