[1] |
王广德,韩黎明,柴震林,等. 上海浦东机场一跑道地基沉降规律[J]. 工程地质学报,2012,20(1):131-137.(WANG Guangde,HAN Liming,CHAI Chenlin,et al. Subgrade settlement rules of first runway of Pudong airport in Shanghai[J].Journal of Engineering Geology,2012,20(1):131-137.(in Chinese))
|
[2] |
杨斐,杨宇亮,孙立军. 飞机起降荷载作用下的场道地基沉降[J]. 同济大学学报:自然科学版,2008,36(6):744-748.(YANG Fei,YANG Yuliang,SUN Lijun. Settlement of runway subgrade under moving aircraft loads[J]. Journal of Tongji University:Natural Science,2008,36(6):744-748.(in Chinese))
|
[3] |
金宗川,顾国荣,韩黎明,等. 大面积堆载作用下软土地基变形特性[J]. 岩石力学与工程学报,2005,24(6):1 056-1 060.(JIN Zongchuan,GU Guorong,HAN Liming,et al. Deformation properties of soft subsoil under large-scale preload[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(6):1 056-1 060.(in Chinese))
|
[4] |
中华人民共和国行业标准编写组.JTG/TD31-02-2013 公路软土地基路堤设计与施工技术细则[S]. 北京:人民交通出版社,2013.(The Professional Standards Compilation Group of People¢s Republic of China. JTG/T D31-02-2013 Technical specifications for design and construction of highway embankment on soft ground[S]. Beijing:China Communications Press,2013.(in Chinese))
|
[5] |
邓礼久,金亮星,罗嘉金. 塑料排水板堆载预压法处理软基的固结效果[J]. 铁道科学与工程学报,2013,10(3):68-72.(DENG Lijiu,JIN Liangxing,LUO Jiajin. Consolidation effect of reinforcing soft soil foundation by preloading accumulation load method with plastic drainage plate[J]. Journal of Railway Science and Engineering,2013,10(3):68-72.(in Chinese))
|
[6] |
李婉,董志良,陈正汉.塑料排水带堆载法在填海造陆复杂地基处理中的试验研究[J]. 水运工程,2005,(12):55-63.(LI Wan,DONG Zhiliang,CHEN Zhenghan. Experimental study on treatment of complicated ground formed by land reclamation with geodrain- loading method[J]. Port Waterway Engineering,2005,(12):55-63.(in Chinese))
|
[7] |
李国维,杨涛,殷宗泽. 公路软基超载预压机制研究[J]. 岩土工程学报,2006,28(7):896-901.(LI Guowei,YANG Tao,YIN Zongze. Study of mechanism about surcharge preloading method on the soft ground of highways[J]. Chinese Journal of Geotechnical Engineering,2006,28(7):896-901.(in Chinese))
|
[8] |
李国维,盛维高,蒋华忠,等. 超载卸荷后再压缩软土的次压缩特征及变形计算[J]. 岩土工程学报,2009,31(1):118-123.(LI Guowei,SHENG Weigao,JIANG Huazhong,et al. Secondary compression characteristics and settlement calculation of soft clay under overloading-unloading and reloading[J]. Chinese Journal of Geotechnical Engineering,2009,31(1):118-123.(in Chinese))
|
[9] |
胡亚元. 考虑预固结时堆载预压卸载的沉降标准[J]. 浙江大学学报:工学版,2010,44(8):1 615-1 620.(HU Yayuan. Settlement standard of unloading time for preloading method with an eye to pre-consolidation time[J]. Journal of Zhejiang University:Engineering Science,2010,44(8):1 615-1 620.(in Chinese))
|
[10] |
刘吉福,莫海鸿,魏金霞. 对工后沉降法确定卸载时机的研究[J]. 岩石力学与工程学报,2006,25(增2):3 518-3 522.(LIU Jifu,MO Haihong,WEI Jinxia. Study on determination of unloading time using method of settlement after construction[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(Supp.2):3 518-3 522.(in Chinese))
|
[11] |
刘吉福,莫海鸿. 对沉降速率法确定卸载时机的认识[J]. 岩石力学与工程学报,2007,26(增1):3 065-3 072.(LIU Jifu,MO Haihong. Understanding of determination of unloading time using settlement velocity method[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(Supp.1):3 065-3 072.(in Chinese))
|
[12] |
中华人民共和国行业标准编写组.MH/T 5027—2013 民用机场岩土工程设计规范[S]. 北京:中国民航出版社,2013.(The Professional Standards Compilation Group of People¢s Republic of China. MH/T 5027—2013 Code for geotechnical engineering design of airport[S]. Beijing:Civil Aviation Press,2013.(in Chinese))
|