Citation Search Quick Search
  2019, Vol. 38 Issue (9): 1776-1785    DOI: 10.13722/j.cnki.jrme.2019.0001
Artiles Current Issue | Archive | Adv Search |
Study on working performance evaluation of the high arch dam of Dagangshan#br# hydropower station during the initial impoundment period
MA Ke1,2,WANG Longjiang3,ZHUANG Duanyang1,2,LONG Liji3,ZHANG Guoxin4,LV Pengfei5
(1. Institute of Rock Instability and Seismicity Research,Dalian University of Technology,Dalian,Liaoning 116024,China;2. State Key Laboratory of Coastal and Offshore Engineering,Dalian University of Technology,Dalian,Liaoning 116023,China;3. College of River and Ocean Engineering,Chongqing Jiaotong University,Chongqing 400074,China;4. China Institute of Water Resources and Hydropower Research,Beijing 100038,China;5. Guodian Dagangshan Hydropower Development Co.,
Ltd.,Ya?an,Sichuan 625409,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号