Citation Search Quick Search
  2024, Vol. 43 Issue (S1): 3363-3373    DOI: 10.13722/j.cnki.jrme.2022.1329
Artiles Current Issue | Archive | Adv Search |
Mechanism study of thick-hard overburden pre-cracking weakening to control the height of water conducted fracture zone
ZHANG Yujun1,2,3,4,XIAO Jie1,LI Youwei1,SONG Yejie2,3
(1. Coal Mining Branch, China Coal Research Institute, Beijing 100013,China;2. CCTEG Coal Mining Research Institute,Beijing 100013,China;3. Coal Mining and Designing Department,Tiandi Science and Technology Co.,Ltd.,Beijing 100013,China;
4. State Key Laboratory for Intelligent Coal Mining and Strata Control,Beijing 100013,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号