Abstract The preliminary design for t reatment of fault and improvement of grouting quality in TBM tunnel are presented. Using some hollow segment s for support liner , the geological st ructure , such as fault , crack , or even karst cavity could be easily dealt with. Moreover , the presented method does not hamper TBM′s work.
|
Received: 18 October 1999
|
|
|
|