Abstract Due to uneven distribution of ground silty clay,the large settlement and structure crack are found in the 4-story building. Through scheme optimization,the static bolt-pile reinforcement is adopted,and favorable effect is obtained. The principle of static bolt-pile reinforcement is described and some problems that should be noticed in the course of design and construction are set forth.
|