DESIGN AND CONSTRUCTION OF THE DEEP PIT SLOPE FOR WUHAN LABOUR MARKET BUILDING IN CHINA |
Gao Qi1, Li Huanqiu2, Yuan Peizhong2, Min Zhiqing2 |
(1 Huazhong University of Science and Technology, Wuhan 430074 China) (2 The Third Engineering Institute of General Staff,PLA, Luoyang 471023 China) |
|
|
Abstract Wuhan Labour Market Building is located at the west of Xinhua road,Hankou district,Wuhan. The geological conditions of the building foundation are very complicated and the pit is 8 meters deep. The design and construction process of the pit slope are introduced. It is pointed out that the keys of deep pit supported by shotcrete-bolt are construction according to the information,feasible design,and close cooperation between the excavation and the construction of shotcrete-bolt,and flexible management.
|
|
|
|
|
1黄 |
强. 深基坑支护工程设计技术[M]. 北京: 中国建材工业出版社,1995
|
2李 |
欢秋,张福明,赵玉祥. 淤泥质土中锚杆锚固力现场试验及其应用[J]. 岩石力学与工程学报,2000,19(增):922~925
|
|
|
|