Abstract Hangzhou metro line No.1 project is encountered with complex problems of geology,hydrogeology,and anthropogenic surroundings. Based on the characteristics of the overhead stations,open excavation and excavation running tunnel,the main geotechnical preambles are analyzed,which may provide valuable references to engineering geology investigation,design,and construction.
|
|
Received: 09 December 2004
|
|
|
|
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|